Reported 08/20/2021 12:00 AM
Project Title

Oliver Road Pump Station Project

Physical Address View project details and contacts
City, State (County) Erie, PA   (Erie County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,200,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Contract 1 Gravity Sewer Replacement. The Contract will consist of removal and replacement of sanitary sewers and laterals; reconnection of gravity sewers to existing manholes; relocation of storm sewers and inlets that conflict with proposed work; removal and restoration of concrete sidewalks, curb ramps, driveway aprons and concrete curbing; removal and restoration of street pavement disturbed; restoration of all disturbed lawns, landscaping, fencing and other facilities, and preparation and implementation of traffic control plan. Contract 2 - Force Main Replacement. The Contract will consist of horizontal directional drilling and installation of HDPE pipe; installation of ductile iron piping by open cut excavation including pipe bedding; installation of valves, air release valves and air release manholes; installation of concrete thrust/anchor blocks at ends of all HDPE pipe runs; installation of HDPE to ductile iron pipe transition couplers; connection of HDPE pipe to discharge manhole; quality control and pipe testing; site security; connections to pipelines and surface restoration of all disturbed areas. Contract 3 Pump Station Replacement. The Contract will consist of clearing, grubbing and stripping; all site work including demolition, earthwork, excavation, backfill, aggregate subbase, paving, surface restoration; parking areas; electrical connections from power source supply to Pre-Engineered Pump Station Building ; furnishing, installation, testing and startup of the Pre-Engineered Pump Station with all components; all tanks, structures, buildings, piping, equipment; coordination with utility companies; dewatering as required for construction of the facilities; development and implementation of a Maintenance of Service Plan; start-up of all equipment; clean water testing of the pump station prior to final commissioning and placement into service. This includes pumping of water during the testing, recording of data; quality control and testing; site security; coordination with Contract 2 Force Main and Contract 1 Gravity Sewers; implementing and maintaining Erosion and Sediment Control Plan; payment of all utility bills associated with construction and any bypass pumping required for maintenance of conveyance.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents