Similar Projects
Sandy City Well and Pump Station Maintenance Services (2020/21)
Post-Bid
Sandy, UT 84070

6200 South Zone C Pump Station
Term Contract
Post-Bid
West Jordan, UT 84081

Construction of the Booster Pump Station
Results
Less than $55,000 est. value
Herriman, UT 84096

SLC Airport Pumphouse Station #1
Results
Salt Lake City, UT 84122

Stonebridge Maintenance Variable Speed Pump Station Replacement
Post-Bid
West Valley City, UT 84120

Golden Hills Pump Station Rehabilitation
Results
$276,000 est. value
Cottonwood Heights, UT 84121

Industrial Lift Station Rehab and Piping Upgrades
Post-Bid
Salt Lake City, UT

500 West Lift Station Rehabilitation
Results
$274,000 est. value
Salt Lake City, UT 84115

Zone 2 and 3 Pump Station and Pipeline Project
Post-Bid
Herriman, UT 84096

900 North Lift Station Rehabilitation
Results
Less than $1,257,000 est. value
Salt Lake City, UT 84115

SLC WRF Influent Pump Rebuild Project
Post-Bid
Less than $369,000 est. value
Salt Lake City, UT

Airport Pump Station Pump 5 and Motor Installation
Results
West Jordan, UT 84088

20E Pioneer WWPS Replacement Project
Renovation
Post-Bid
$1 to $3,400,000 est. value
West Valley City, UT

New Rose Park Lift Station Replacement (SS02)
Results
Less than $419,000 est. value
Salt Lake City, UT 84116

Rosecrest Pump Station Improvements Project
Results
Less than $998,000 est. value
Herriman, UT 84096

Last Updated 06/02/2021 02:54 PM
Project Title

15000 South PI Pump Station

Physical Address View project details and contacts
City, State (County) Bluffdale, UT 84065   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install a 1268 SF masonry building and associated pipe works to provide a complete and functional pressurized irrigation pump station. Connect new piping to the existing pressurized irrigation system.

Details

1 Lift and Pump Stations, to 1,268 SF New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents