Similar Projects
Tennis Center - Construction - Town of Flower Mound
Infrastructure
Conception
$12,250,000 CJ est. value
Flower Mound, TX 75022

Peabody Hotel
New Construction, Infrastructure - 345,130 SF
Design
$98,000,000 CJ est. value
Roanoke, TX 76262

Peabody Hotel
New Construction, Infrastructure - 345,130 SF
Design
$98,000,000 CJ est. value
Roanoke, TX 76262

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Admissions Building Foundation Stabilization
Infrastructure
Post-Bid
Denton, TX

Silverado West Phase 2 Paving Improvements
Results
Aubrey, TX

Bruton Orand Boulevard at FM 1171 - Right Turn Lane
Results
$252,742 est. value
Flower Mound, TX 75028

Murphy Express #8925 / Crossroads
New Construction, Infrastructure - 5,233 SF
Construction
$1,500,000 CJ est. value
Crossroads, TX 76227

Presidium - Frisco Square
New Construction, Infrastructure
Construction
$60,000,000 CJ est. value
Frisco, TX 75033

Aloft / Lewisville
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Lewisville, TX 75067

Aloft / Lewisville
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Lewisville, TX 75067

Denton State Supported Living Center / Building # 516 & 556
Renovation, Infrastructure - 13,000 SF
Design
$3,332,700 CJ est. value
Denton, TX 76210

Old Justin Road - Mass Grading, Paving, Water, Sanitary, and Drainage Facilities
Infrastructure
Post-Bid
Northlake, TX 76226

Utility Cut Repairs and Park Improvements
Term Contract
Results
Flower Mound, TX

Velvet Taco - Grandscape
New Construction, Infrastructure - 2,388 SF
Construction
$1,000,000 CJ est. value
The Colony, TX 75056

Last Updated 04/11/2023 08:03 PM
Project Title

Construction of Landscape Improvements to serve Harvest Phase 14

Physical Address View project details and contacts
City, State (County) Northlake, TX 76247   (Denton County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $270,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located in the ETJ of the Town of Northlake, Texas, along the South side of Old Justin Road and West of Cleveland-Gibbs Road. The site may be reached from Interstate Highway 35W by traveling north to the FM-407 exit. Exit FM-407 and turn left, heading west. Continue heading west for approximately 0.3 miles and turn right onto Cleveland-Gibbs, heading north. This project scope is +-16,200 square feet (.37 acres) of Landscape and associated Irrigation scope. Each Bid must be accompanied by a bid bond or a certified or cashier's check, acceptable to the Owner, in an amount not less than 5 percent of the total amount bid, as a guarantee that the successful bidder will enter into the Contract and execute the Bonds on the forms provided and provide the required insurance certificates within 7 days after the date the Contractor is notified. Question Deadline 04/03/2023 All questions about the meaning or intent of the Bidding Documents are to be directed to Engineer Questions received less than 72 hours prior to the date for opening of Bids may not be answered. Only questions answered by formal written addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents