Similar Projects
PRESS - Rehabilitate Taxiway - Anderson Municipal Airport
Infrastructure
Conception
$570,950 est. value
Anderson, IN 46017

Replace Superstructure
Demolition, New Construction, Infrastructure
Design
$1,960,284 CJ est. value
Anderson, IN 46012

Replace Superstructure
Demolition, New Construction, Infrastructure
Design
$1,960,284 CJ est. value
Anderson, IN 46012

RFP - Madison County Replacement of Bridge 054, CR 1000 N over Duck Creek (Des # 2201640) in the Greenfield District.
Renovation, Infrastructure
Bidding
$4,669,000 CJ est. value
Elwood, IN 46036

RFP - Madison County Replacement of Bridge 054, CR 1000 N over Duck Creek (Des # 2201640) in the Greenfield District.
Renovation, Infrastructure
Bidding
$4,669,000 CJ est. value
Elwood, IN 46036

2021-2 Community Crossings Resurfacing Project
Infrastructure
Post-Bid
$150,000 est. value
Ingalls, IN

RFP D/B - Design, Build, Finance and Operate an Indoor/Outdoor Community Aquatics Center
New Construction, Infrastructure
Post-Bid
$3,500,000 CJ est. value
Pendleton, IN 46064

Pavement Preservation HMA Asphalt Overlay
Infrastructure
Results
Chesterfield, IN

CCMG - Madison Avenue, Brown Delaware and West 29th Street Resurfacing and Maintenance
Infrastructure
Results
Anderson, IN 46015

Madison County Jail
New Construction, Infrastructure - 106,000 SF
Pending Verification
$87,000,000 CJ est. value
Anderson, IN 46016

WAWA - Anderson
New Construction, Infrastructure
Pending Verification
$1,600,000 CJ est. value
Anderson, IN 46016

Various Roadway Resurfacing and Repairs
Infrastructure
Post-Bid
$2,000,000 est. value
Pendleton, IN

2022 Contract Paving Project-1
Infrastructure
Results
Anderson, IN

New Columbus Road / County Road 100 East Paving
Infrastructure
Post-Bid
$758,000 CJ est. value
Adams Township, IN 46013

CCMG 2022 - 1 Resurfacing
Infrastructure
Results
$2,000,000 est. value
Anderson, IN

Last Updated 05/10/2023 10:07 AM
Project Title

Bridge Rehab and Intersection Improvement, Roundabout - SR 13

Physical Address View project details and contacts
City, State (County) Anderson, IN 46011   (Madison County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $747,338 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work Type: HMA Overlay, Preventive Maintenance Over Sand Creek, 00.56 Miles N of Sr 38 Project Control No. 1702923 1702933 Federal/State No. 170292300ST3 170293300ST3 DBE Goal:12.00 An executed bid bond shall be included with all bids. Only electronic bid bonds submitted through the designated electronic medium, either Surety2000 or Tinubu Surety Solution, will be accepted with the bid. A fully executed performance bond shall be included with all bids, except on contracts for roadside mowing, vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of $100,000 or less, when the bidder may elect not to furnish a performance bond. Electronically does not support submittal of the performance bond. The performance bond must be submitted to the Construction Letting email inbox or be delivered on paper by the time set for receipt of proposal bids. Each contractor that submits a proposal bid in the amount of $150,000 or more for highway improvements described in this notice is required to submit with that bid a written plan for a program to test the contractor's employees for drugs. The plan shall be in compliance with Indiana Code 4-13-18. The plan must be submitted to the Construction Letting email inbox or deposited with the INDOT Prequalification Engineer by the time set for receipt of proposal bids. *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. INDOT - Call 200 - Bridge Rehab and Intersection Improvement, Roundabout - SR 13

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents