Similar Projects
Orchestra Room Additions at Briscoe JHS, Foster HS, Reading JHS, George Ranch HS, Leaman JHS, and Fulshear HS
Addition, Demolition, Infrastructure - 4,400 SF
Design
$6,300,000 CJ est. value
Richmond, TX 77469

Sugar Land Regional Airport Runway 17/35 Rubber Removal and Paint Markings
Infrastructure
Design
$50,000 CJ est. value
Sugar Land, TX 77498

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Construction of South Post Oak Sportsplex Baseball Fields Phase II for Fort Bend County
New Construction, Infrastructure
Bidding
$100,000 CJ est. value
Houston, TX 77053

Mustang Bayou Wastewater Treatment Plant Expansion and Rehabilitation Project
Addition, Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$6,600,000 CJ est. value
Fresno, TX 77545

Roadway Construction to Serve Sienna Village of Destrehan Section 1
Post-Bid
$800,000 est. value
Missouri City, TX

City of Stafford General Street Repairs
Results
Stafford, TX 77477

Roadway Construction to Serve Sienna Village of Destrehan Section 3
Results
Katy, TX

WhiteWater Express Car Wash / Richmond
New Construction, Infrastructure - 4,167 SF
Pending Verification
$1,600,000 CJ est. value
Richmond, TX 77406

WhiteWater Express Car Wash / Richmond
New Construction, Infrastructure - 4,167 SF
Pending Verification
$1,600,000 CJ est. value
Richmond, TX 77406

Paving Facilities in Candela Section 8
Infrastructure
Post-Bid
$420,000 est. value
TX

Knight Road Extension
Results
$8,500,000 est. value
Missouri City, TX 77459

Road Construction Improvements On Front Street for Fort Bend County Mobility Bond Project
Infrastructure
Post-Bid
Richmond, TX 77469

Fort Bend Parkway Toll Road from Sienna Parkway to Sienna Ranch Road
Infrastructure
Results
$29,000,000 est. value
Thompsons, TX

Lift Station No. 1 Forcemain Replacement to Serve Riverwood Village Section One
Infrastructure
Post-Bid
$350,000 CJ est. value
Richmond, TX 77469

Last Updated 12/09/2022 06:36 AM
Project Title

Re-Bid - Fulbrook on Fulshear Section 19, Phase 1b - Paving Improvements

Physical Address View project details and contacts
City, State (County) Fulshear, TX 77441   (Fort Bend County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $738,295 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This work entails the paving improvements for Fulbrook on Fulshear Creek Section 19 located in Fulshear MUD No. 1. All permitting required for this project shall be obtained from the City of Fulshear as this project is within the City of Fulshear limits. The deadline to ask questions is 12/02/2022 12:00 PM CST The Owners reserves right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process expect time of submitting a Bid Scope of Work of the Contract includes the following: Paving Improvements 1. Roadway Excavation 2. 6" Concrete Pavement (3,500 psi w/ No. 3 bars at 18" c-c) 9,758 3. 4" Concrete Curb 4. 6" Concrete Curb 5. 8-inch Stabilized Subgrade Manipulation and Compaction 6. Lime for Subgrade 7. Wheel Chair Ramp (ADA Approved W/ Concrete Pavers) 8. Traffic Signs 9. Traffic Striping, Pavement Markings, Buttons and Blue Reflectorized Buttons for Flush Valves 10. Remove and Dispose Existing Type III Barricade 11. 6" PVC Irrigation Sleeve Job.no- 2018-044-W78-011

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents