Similar Projects
Remove Hazardous Materials From Various District Locations
Term Contract
Post-Bid
$230,000 est. value
Chicago, Cicero, Schaumburg, Skokie, IL 60076

Northwest Parking Lot Improvements
Post-Bid
IL

Sidewalk, Curb
Results
Hanover Park, IL

Elevator Upgrade and Fire Alarm Replacement
Renovation
Results
Chicago, IL 60612

Community Athletic Fields Concrete ADA Ramp
Post-Bid
Elk Grove Village, IL

Replace Passenger & Freight Elevators At Heating & Refrigeration Plant
Renovation
Results
Chicago, IL 60666

Removal and Replacement Existing Damage Sidewalk, Curb and Gutter
Post-Bid
Bartlett, IL

2022 Sidewalk and Concrete Maintenance
Results
Palatine, IL 60067

County Line Road: I-294 Ramp to North Avenue
Post-Bid
IL

2021 Sidewalk Improvements
Results
Buffalo Grove, IL

2021 Sidewalk, Curb and Gutter Program
Post-Bid
Niles, IL

CDBG Sidewalk Program
Results
Less than $310,650 est. value
Mount Prospect, IL

Portable Restrooms
Post-Bid
Palatine, IL

2020 Green Alley Program - Supplemental Alley
Results
$300,000 est. value
Lyons, IL

2021 Sidewalk Program - CDBG
Post-Bid
Palatine, IL

Last Updated 08/04/2022 01:33 AM
Project Title

Sidewalk Snow and Ice Removal

Physical Address View project details and contacts
City, State (County) Winnetka, IL 60093   (Cook County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Service/Term Contracts, Sidewalks/Parking Lot
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Village of Winnetka is accepting sealed bids for Snow & Ice Removal Services for sidewalks located in the Villages central business district. This program will consist of but is not limited shoveling, blowing, and otherwise manual removal of snow and ice from sidewalks. The proposed contract would be for a period of thirty-six (36) months. This agreement is expected to commence November 1,2022 and terminate on April 15, 2025 with an option to extend, at the Villages discretion for an additional two (2) years. For the optional, additional 2 years, contractor will be permitted to increase the rates and charges by a percentage not to exceed the percentage increase in the Consumer Price Index for All Urban Consumers (CPI-U) for the Chicago-Naperville-Elgin, IL, IN, WI Area issued by the United States Department of Labor between January 15th of the preceding calendar year and January 15th of the current calendar year; provided, however, than no increase in the Agreement Price shall exceed 2.5% over the previous year. Contractor must provide the Village with written notice of proposed increase in the Agreement Price no later than 90 days prior to the beginning of years 4 and 5. Bid Bond None Plan (blueprint) None

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents