Similar Projects
Urbana at Centerville
New Construction
Conception
Garland, TX 75040

Greenville Avenue Townhomes
New Construction
Design
Richardson, TX 75081

Preston Center Apartment Tower
New Construction
Design
Dallas, TX 75225

Carbon Pump Station Improvements
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Irving, TX 75038

Judge Charles R. Rose Community Park Phase 1
New Construction, Infrastructure - 260,360 SF
Sub-Bidding
$3,000,000 CJ est. value
Dallas, TX 75241

Replacement of Fire Station 41
New Construction, Infrastructure - 8,248 SF
Post-Bid
$4,208,000 CJ est. value
Dallas, TX 75230

Replacement of Fascia, Soffit, Wood Trim, Gutters and Downspouts, and Exterior Painting at Roseland Estates
Renovation
Post-Bid
$25,000 CJ est. value
Dallas, TX 75204

1000 Unit Housing Challenge
New Construction
Results
Dallas, TX

Single Family Home Rehabilitation- 4938 Creekridge
Renovation
Results
Garland, TX 75043

The Academic Apartment Development
New Construction
Construction
Dallas, TX 75204

Broadstone Apartments
New Construction
Construction
$65,000,000 est. value
Dallas, TX 75205

Huntington Townhomes
Demolition, New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Richardson, TX 75080

Huntington Townhomes
Demolition, New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Richardson, TX 75080

Mockingbird Lane Office Development
New Construction, Infrastructure - 150,000 SF
Design
$32,000,000 CJ est. value
Dallas, TX 75235

TRN Signal Construction - Group 10
Infrastructure
Post-Bid
$400,000 CJ est. value
Dallas, TX 75201

Last Updated 11/16/2022 02:16 PM
Project Title

January Lane Hybrid Housing / Apartments

Physical Address View project details and contacts
City, State (County) Grand Prairie, TX 75050   (Dallas County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Multi-Family Homes, Single-Family Homes, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $49,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 16, 2022 the project is under final plat review. There is currently no information concerning a general contractor or construction timeline. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

3 Stories Above Grade, Parking Spaces, 173 Parking Spaces. New Construction, New Construction. New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents