Similar Projects
Transportation Research Building - University of Alabama
New Construction, Infrastructure
Conception
$16,500,000 CJ est. value
Tuscaloosa, AL 35401

Transportation Research Building - University of Alabama
New Construction, Infrastructure
Conception
$16,500,000 CJ est. value
Tuscaloosa, AL 35401

Hanna Steel Manufacturing Plant Addition
Addition, Demolition, Infrastructure - 9,000 SF
Design
$10,000,000 CJ est. value
Tuscaloosa, AL 35401

Tuscaloosa Fire Rescue - Station 11 Construction
New Construction, Infrastructure
Bidding
$3,631,000 CJ est. value
Tuscaloosa, AL 35401

Northport Wtp Chemical System Improvements
Infrastructure
Bidding
$1,300,000 CJ est. value
Northport, AL 35476

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Oliver-Barnard and Tuomey Halls Renovations and Addition - University of Alabama
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$1,500,000 CJ est. value
Tuscaloosa, AL 35401

Additional Lanes, Access Management, and Bicycle/ Pedestrian Improvements
Infrastructure
Results
$629,718 est. value
Tuscaloosa, AL

2021 Boring Services Project
Infrastructure
Results
Less than $50,000 est. value
Tuscaloosa, AL

2021 American Rescue Plan Act, Meter Replacement Project- Contract A, B, C
Infrastructure
Construction
$421,268 CJ est. value
Buhl, AL 35446

Element Hotel / Tuscaloosa
New Construction, Infrastructure
Pending Verification
$27,000,000 CJ est. value
Tuscaloosa, AL 35401

Peninsula Subdivision
New Construction, Infrastructure
Pending Verification
$3,910,000 CJ est. value
Tuscaloosa, AL 35406

Garner Road Cipp Line - 62240280 - 22005 - City of Tuscaloosa
Infrastructure
Conception
$4,300,000 CJ est. value
Tuscaloosa, AL 35405

Benjamin Barnes YMCA Construction Project
New Construction, Infrastructure
Bidding
$10,230,000 CJ est. value
Tuscaloosa, AL 35401

City Wide Resurfacing 2021
Infrastructure
Post-Bid
Tuscaloosa, AL

Last Updated 07/06/2023 06:31 PM
Project Title

Constructing the Roadway and Sidewalk Improvements (Planing, Resurfacing, and Traffic Stripe) - CR-47

Physical Address View project details and contacts
City, State (County) Tuscaloosa, AL 35406   (Tuscaloosa County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $2,105,608 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Tuscaloosa County Contract Time: 105 Working Days DBE Goal Percent:4.00 For constructing the Roadway and Sidewalk Improvements (Planning, Resurfacing, and Traffic Stripe) on CR-47 (Watermelon Road) from the junction of SR-6 (US-82/McFarland Boulevard) to the junction of Union Chapel Road East to include Traffic Signal Improvements at Rice Valley Road. Length 1.838 mi. The Bracket Estimate on this project is from $1,722,770 to $2,105,608 . If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 031 - Constructing the Roadway and Sidewalk Improvements (Planing, Resurfacing, and Traffic Stripe) - CR-47 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents