Similar Projects
Reported | 11/28/2018 12:00 AM |
Project Title | Communication Suite Flooring Replacement, Moving Sidewalk Removal, Installation of One-Way Corridor |
Physical Address | View project details and contacts |
City, State (County) | Albuquerque, NM (Bernalillo County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Description of Work: Removal of existing floor finishes in the Communication Suite, removal of existing moving sidewalk and installation of a new security exit corridor system. The Communication Suite`s existing floor finish consists of carpet tile and vinyl composition tile which must be replaced. The airside corridor system, near the TSA checkpoint, contains a 100 foot moving sidewalk that will be removed. A permanent floor matching the existing brick paver floor system will replace the area where the sidewalk is removed. The existing revolving, turnstile doors adjacent to the TSA checkpoint that is currently used from airside to landside, will be replaced with a new state-of-the-art exit corridor system. | ||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |