Similar Projects
Large Airport Hangar
New Construction
Conception
$1,725,000 est. value
Beaumont, TX

New "T" Hangar
New Construction
Conception
$2,400,000 est. value
Beaumont, TX

Cirrus Aircraft Hangar & Service Center
New Construction - 47,771 SF
Design
$9,000,000 est. value
McKinney, TX 75069

Crew Capsule Hanger and Processing Facility
New Construction - 12,547 SF
Design
$3,000,000 est. value
Van Horn, TX 79855

Box Hangar for Mesquite Metro Airport
New Construction - 15,000 SF
Bidding
$500,000 est. value
Mesquite, TX 75181

Kickapoo Downtown Airport Hangar Design-Build
New Construction - 8,000 SF
Bidding
$787,901 est. value
Wichita Falls, TX 76302

New Hangar at Palacios Municipal Airport
Post-Bid
$290,000 est. value
TX 77465

Thomas Airport Hangar Maintenance
Post-Bid
Sinton, TX 78387

Corporate Hangar Project
Results
$470,982,893 est. value
Killeen, TX 76549

Kickapoo Airport Hangar Design Build
Results
$400,000 to $800,000 est. value
Wichita Falls, TX 76302

Braniff Hangars Phase II
New Construction - 49,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Dallas, TX 75209

Sugar Land Regional Airport Hangar
New Construction - 40,000 SF
Construction
$8,000,000 est. value
Sugar Land, TX 77498

Airport Expansion and Improvements - Buildings
Renovation
Pending Verification
$4,446,383 est. value
TX

Design Build T-Hangars and Box hangers
New Construction
Design
$4,300,000 est. value
Bryan, TX

Hangar 75 Modular Installation (JBSA-Randolph)
Post-Bid
Randolph, TX

Last Updated 06/07/2022 07:27 AM
Project Title

Killeen-Fort Hood Regional Airport Corporate Hangar Phase II

Physical Address View project details and contacts
City, State (County) Killeen, TX 76549   (Bell County)
Category(s) Transportation
Sub-Category(s) Aircraft Hangar
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes, but is not limited to, the construction of a new hangar building, with office space along with access road, utility services, and associated improvements. The base bid items will include the site work including all work outside of the proposed building footprints (Base Bid Schedule A), along with construction of the hangar building (Base Bid Schedule B). The additive alternates will include the offices interior framing and finish out (Alternate 1), 2nd Floor structure over office space for future expansion (Alternate 2), hangar bay wet pipe sprinkler system (Alternate 3), and hangar bay extension (Alternate 4). See proposal for more information on bid schedules and base bid work.

Details

Aircraft Hangar, New Construction.
Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Rigid Paving, Concrete Paving, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents