Similar Projects
Purchase of Headworks Biofilter Engineered Media
Post-Bid
Syracuse, UT 84075

2 Blowers for the Headworks Biofilter
Post-Bid
Syracuse, UT 84075

Final Effluent Pipeline Project
Bidding
Syracuse, UT

Regional Wastewater Secondary Clarifier Addition
Results
Cedar City, UT

Dryer Product Piping Replacement
Post-Bid
West Jordan, UT 84084

2020 Wastewater Improvements
Results
Less than $310,000 est. value
Manti, UT 84642

Equipment for Toole Water Reclamation Facility Filter Upgrade and Expansion
Renovation
Bidding
Erda, Tooele, UT 84074

Wastewater Treatment Plant 2020 General Upgrades
Results
Springville, UT

2020 Wastewater Treatment Capital Improvements
Post-Bid
Garland, UT 84312

Plant Influent Bypass Pumping, Piping, and Operations
Renovation
Post-Bid
Syracuse, UT 84075

Mixing System Equipment for the Provo WATRR Center Phase 1 Project
Post-Bid
$90,000,000 est. value
Provo, UT 84601

Wastewater Treatment Plant 2.4 MGD Expansion
Post-Bid
Salt Lake City, UT 84005

Fine Screen Equipment for the Provo WATRR Center Phase 1 Project
Post-Bid
Provo, UT 84601

New Water Reclamation Facility
Post-Bid
Less than $80,000,000 est. value
Spanish Fork, UT

Last Updated 03/25/2021 01:22 PM
Project Title

2021 Yard Piping Improvements Bioreactors

Physical Address View project details and contacts
City, State (County) West Jordan, UT 84084   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the following Items: The Work consists of the replacement of several buried service connections to the bioreactors. The replacements include removing piping and valves and installing new piping with hydrants and gate valves. The work also includes an additional valve replacement near the clarifiers. Materials to be removed which are less than 5 feet below the ground surface shall be removed and lawfully disposed of offsite. Materials which are deeper than 5 feet shall be plugged and abandoned in place

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 09 - Finishes, Painting and Coating.
Division 11 - Equipment, Laboratory Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 46 - Water and Wastewater Equipment, Biological Treatment Systems, Membrane Biological Reactors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents