Similar Projects
Galvanized Water Line Phase 3 and Abingdon Water Storage Tank Replacement Project Construction Administration / Post Construction Services Request for Statements of Qualifications (RFSOQ)
Post-Bid
Abingdon, VA 24212

Water Tank Maintenance Services
Post-Bid
Middleburg, VA 20117

F--Cleaning and Removal Tank Fluids
Term Contract
Results
Norfolk, VA 23511

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Construction of Repairs and Recoating to Water Tanks
Results
Craigsville, Haynesville, Mitchells, VA 22472

High Density Lime Slurry and Storage Tanks
Term Contract
Results
Woodbridge, VA 22191

Construction - Underground Storage Tank Removal Dublin VA
Results
$25,000 to $100,000 est. value
Dublin, VA 24084

Penderwood Tank 3 Rehabilitation
Results
$984,799 est. value
Fairfax, VA 22031

Water Tank Rehabilitation
Results
$514,000 est. value
Buckingham, VA 23921

5,000 Gallon Hydropneumatic (Northfields Tank) Exterior Spot Repaint, Wet Interior Repaint and Miscellaneous Repairs
Results
$38,000 est. value
Charlottesville, VA 22911

Dominion Valley Tank Residual Control System
Results
Woodbridge, VA

Western Branch Tank Rehabilitation
Results
Less than $781,500 est. value
Chesapeake, VA 23328

Removal of Water Tank at Roanoke County's Explore Park
Results
$14,885 est. value
Roanoke, VA 24014

Airport East Water Storage Tank and Pump Station
Results
$6,100,000 est. value
Hanover, VA 23069

Last Updated 08/07/2020 11:51 AM
Project Title

Braemar Water Storage Tank - Rehabilitation and Hoadly Water Storage Tank - Fill Pipe Replacement

Physical Address View project details and contacts
City, State (County) Bristow, Woodbridge, VA   (Prince William County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project A: Braemar Water Storage Tank - Rehabilitation 1. Mobilization 2. Replacement of twenty (20) feet of Interior Wet ladder. 3. Structural improvements including, installation of exhaust vents, roof access grab bars, ladder up, roof plates, access tube gap plates, toe plates, railing, swing gates, thermal probe brackets, additional overflow brackets, riser pipe brackets and supports, eight (8) pedestal vent insect screens on the exterior dry, interior insect screens, and telecommunication replacement caps. 4. Stainless steel cable fall protection assemblies. 5. Interior and exterior pit and surface repairs. 6. Concrete and grout repair on exterior tank base. 7. Waste management. 8. Interior dry surface power tool clean, surface preparation, and coatings. 9. Interior wet surfaces abrasive blast and coatings. 10. Exterior surfaces high pressure water clean and coatings. 11. Exterior steel anti-graffiti coating on first ten (10) feet of tank side wall. Project B: Hoadly Water Storage Tank - Fill Pipe Replacement and Repairs 1. Mobilization 2. Pipe support brackets and thermal probe brackets. 3. Stainless steel cable fall protection assemblies. 4. Interior concrete floor preparation and coating. 5. Vault and pipe chase interior surface concrete preparation and coating. 6. Fire hydrant and bollard preparation and coating. 7. Control valves including butterfly valves, altitude valves, gate valves, ball valves, air bleed valves, duckbill check valves, overflow safety valves, and new sample station. 8. Hydrodynamic mixing system. 9. Lightbulb replacements and wiring. 10. Thermal probes and pressure instruments including primary pressure indicating transmitter, secondary pressure transmitter, pressure gauge, and threaded diaphragm seal. 11. Unit heater and heat trace and insulation. 12. Disinfection and hydraulic testing. 13. Site grading, seeding, and site restoration. 14. Demobilization and close-out. 15. Two-Year Warranty. 16. Inlet/outlet pipe replacement.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents