Similar Projects
South District Street and Utility Improvements
Infrastructure
Bidding
$260,000 est. value
Cottage Grove, MN

Hardwood Creek Trail Feasibility Study
Addition
Post-Bid
Hugo, MN

Intelligent Transportation System Control Cabinets
New Construction
Post-Bid

Metro-Wide Traffic Control and Flood Sealing for Bridge Numbers 19095, 27624G, 27210, 9195, 27078, 27V59, 27517, 27526, 27654, 27265, 27R21, 9860, and 82527
Results

CSAH 19 (Woodbury Drive) Mobility and Safety Improvement
Results
Woodbury, MN 55125

Cornerstone Village Apartments
New Construction
Construction
$1,680,000 est. value
Oakdale, MN 55128

Rolling Meadows Residential Development
New Construction, Infrastructure
Construction
Cottage Grove, MN

2021 Parking Lot Improvements
Infrastructure
Post-Bid
Hugo, Saint Paul Park, Stillwater, Woodbury, MN 55082

2021 Pavement Management
Results
$3,680,000 est. value
MN

Traffic Signal Mast Arm Sign Replacement
Infrastructure
Post-Bid
MN

Tamarack Farms Estates Street Improvements
Results
Lake Elmo, MN

Norell Avenue North Improvements
Infrastructure
Post-Bid
Oak Park Heights, MN 55082

2021 Downtown Improvement Project/Lions Park
New Construction, Infrastructure
Results
Hugo, MN 55038

2022 Street Pavement Maintenance Project
Infrastructure
Post-Bid
Forest Lake, MN

Various Highways in MnDOT Districts 1, 3, and Metro Countdown Pedestrian Head Replacement
Infrastructure
Results

Last Updated 05/19/2022 02:20 AM
Project Title

CSAH 14 Signal Replacement - Trail Construction Project

Physical Address View project details and contacts
City, State (County) Oakdale, MN   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $180,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Description: Washington County State Aid Highway 14 Signal Replacement and Trail Construction Project The purpose of this project is to replace the signal systems at the intersections of CSAH 14/34th St N with the Interstate 694 ramps and upgrade them with Flashing Yellow Arrow capability, and also to construct a multi-use bituminous trail along the south side of CSAH 14 from Hadley Avenue to 220 feet east of the Interstate 694 interchange. Additonal Description: Project work includes traffic signal systems replacement, grading, bituminous trail construction, ADA improvements, retaining walls, and work on MnDOT Bridge Numbers 82807 and 82808 on County Highway 14 at and near Interstate 694 in Oakdale, Minnesota.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents