Similar Projects
Apex Community Downtown Streetscape and Parking
Design
Apex, NC 27502

11Th Street Apartments
New Construction
Design
Mebane, NC

Rosehill Road Sidewalk Plan NCDOT Project U-5528Fa
Infrastructure
Bidding
Fayetteville, NC

Hangar Site Development and Parking Lot Expansion
Demolition, Infrastructure, Alteration
Bidding
Smithfield, NC 27577

Police Department Building and Parking Expansion
Post-Bid
Smithfield, NC 27577

Demolition and Reconstruction of Public Walkway
Demolition
Post-Bid
Emerald Isle, NC

Extension of SR-1631 (Crossroads Parkway) to SR-1549 (Calvin Edney Road)
Results
Mars Hill, NC 28754

Avon Creek Greenway Extension
Results
Gastonia, NC

Entrance and Surface Parking Improvements
Construction
Hendersonville, NC 28791

Whiteville High School Tennis Courts and Parking Lots Project
New Construction, Infrastructure
Bidding
Whiteville, NC 28472

Sidewalk Panel Demolish and Replace Contract
Post-Bid
Raleigh, NC

Knightdale Elementary School Pedestrian and Parking Improvements
Results
Less than $146,821 est. value
Knightdale, NC 27545

Installation and Replacement of Concrete Curb Ramps at Various Locations
Infrastructure
Bidding
$2,000,000 est. value

Sidewalk Trip Hazard Assessment and Grinding
Post-Bid
Rocky Mount, NC

Fayetteville Ballpark Entry Plaza Phase II
Results
Fayetteville, NC

Last Updated 04/15/2022 11:42 AM
Project Title

ADA Ramp and Sidewalk Construction Project

Physical Address View project details and contacts
City, State (County) Shelby, NC 28152   (Cleveland County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

ADA Ramp Replacements: 1. Replace 6 existing sidewalk ramps to meet ADA compliance and meet City of Shelby Standard Detail 2.06A, 2.06B, 2.06C. Each ramp shall include retrofitted sidewalk along with an inset ADA dome mat black in color. Locations: 1. S. Morgan St. & Royster Ave. 2. Calvary St. & Gardner St. 3. Cora St. & Sumter St. 4. Steeple St. & N. Lafayette St. 5. Martin St. & Blanton St. 6. Thompson St. & Blanton St. ADA Ramp Installation: 1. Install 9 new sidewalk ramp to meet ADA compliance and meet City of Shelby Standard Detail 2.06A, 2.06B, 2.06C. Each ramp shall include retrofitted sidewalk along with an inset ADA dome mat black in color. Locations: 1. Hobbs Ave. & Piedmont Ave. 2. Martin St. & Blanton St. 3. Webb Dr. & Piedmont Ave. 4. Webb Dr. & Atlantic Ave. 5. Hobbs Ave. & Webb Dr. 6. Hobbs Ave. & Piedmont Ave. Sidewalk Construction: 1. Install approximately 500 linear feet of new sidewalk that meets ADA compliance and meet City of Shelby Standard Detail 2.05. 2. The sidewalk shall be 5’ wide and be minimum of 4” thick. 3. Sections where the sidewalk intersects residential driveway the driveway shall be replaced from the street to the sidewalk. This concrete shall be 6” thick. 4. The sidewalk shall leave 3’ utility strip between curb and sidewalk.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents