Similar Projects
Gene Torres NTMP
Bidding
$200,000 to $300,000 est. value
El Paso, TX

El Paso Zoo Service Road- Veterinary Clinic
Bidding
$80,000 to $100,000 est. value
El Paso, TX 79901

Southern Region Disaster Recovery Support BPA
Post-Bid

River Bend Pedestrian Improvements Phase III
Post-Bid
$3,500,000 est. value
El Paso, TX

New Sidewalk Construction
Results
$100,000 to $250,000 est. value
El Paso, TX 79906

TX FTNP CHAM 10(1), Circle Drive
Results
$750,000 to $1,000,000 est. value
TX

Rehabilitation of Roadway
Bidding
Less than $2,084,575 est. value
TX

Bowie Driveway Pavement and Drainage Improvement
Post-Bid
El Paso, TX

Fort Bliss Paving
Results
$5,000,000 to $10,000,000 est. value
El Paso, TX

BPM
Bidding
Less than $526,870 est. value
TX

Transit System Site Improvements
Post-Bid
El Paso, TX

Z--Clean Drywells and Seal Roads at Fort Bliss National Cemetery. Fy19 NRM Project 886-19-203
Results
$100,000 to $250,000 est. value
El Paso, TX

2020 Road and Bridge Crack Sealing Project
Post-Bid
El Paso, TX 79901

Operational Improvements
Results
Less than $902,173 est. value
TX

Chamizal Neighborhood Pedestrian Enhancements Phase I - Capital Improvement
Results
El Paso, TX 79901

Reported 07/04/2019 12:00 AM
Project Title

Mills Streets Improvements

Physical Address View project details and contacts
City, State (County) El Paso, TX 79901   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,950,000 to $2,350,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Renovations of street and sidewalks along the North portion of El Paso Street and Mills Avenue including Pioneer Plaza. It has been subdivided into Base Bids I & Base Bid II. Base Bid II is comprised of 4 different areas as listed below. Base Bid I: Consists on reconstruction of sidewalk on Mills Avenue between Mesa Street and Oregon Avenue, replace existing brick pavers with new (brick pavers +3” concrete substrate) and thin brick pavers over existing basements (no work to do under basements), remove one traffic lane on the eastbound of Mills Avenue and replace with landscaping, curb and gutter. Add trees in the parkway with LED lights to match SJ Plaza, reconstruct HC ramps with truncated domes tiles and non-lit bollards, new tree grates and two parklets including benches, tables and trash cans. Extension of existing storm sewer inlet (approx. 12’-0” of extension). Paint existing street poles. Base Bid II: Hotel Promenade & Parking Garage Promenade Consists of improvements of eastside sidewalk of El Paso Street between San Antonio Avenue and Pioneer Plaza and parkway improvements on Mills Avenue and Oregon Street fronting Paso Del Norte Hotel. Construction activities include removing and reconstruction of portions of sidewalks, handicap ramps, landscaping, paving markings, benches, trash cans, signs, power poles, tree lights, cross walks. Landscaping to be added in the island of the roundabout, foundation for a future art component.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents