Similar Projects
Upgrades to Athletic Fields
Post-Bid
Mountain Top, PA 18707

Penn Lake Park Improvements CDBG Removal of Architectural Barriers
Results
Penn Lake Park, PA

Bainbridge Campbell Park - Rehabilitation
Results
West Pittston, PA 18643

Pavilions
Results
$200,000 est. value
Hazleton, PA 18201

Fairview Township Memorial Park Basketball Court Renovation Project
Results
Mountain Top, PA 18707

2020 OCD Mccaragher and Grove Streets Park Improvement Project
Post-Bid
Wilkes-Barre, PA 18711

Memorial Park Phase 3 Development
Results
Mountain Top, PA 18707

Church Street Park, Phase II Renovation
Results
Kingston, PA 18704

Synthetic Track Replacement at Pittston Area High School
Results
Yatesville, PA

Ricketts Glen State Park Small Loop Campground General Construction - Add Full Service Campsites
Results
$1,000,000 est. value
PA

Cindy Street Playground Project
Results
$40,000 to $50,000 est. value
West Hazelton, PA 18202

Plane Street Park Concrete Wall Repairs and Fence Improvements Project
Results
Avoca, PA 18641

Park Nature Playground and MS4 Project
Results
Dallas, PA 18612

MS4 Rain Gardens Project
Results
Kingston, Plains, PA

Center City Park
Results
Hazleton, PA 18201

Last Updated 09/16/2020 11:26 AM
Project Title

Inline Netting System for Diversion Chamber #33 Project #10-20

Physical Address View project details and contacts
City, State (County) Nanticoke, PA 18634   (Luzerne County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is to construct a complete inline netting system on the outfall pipe of the existing WVSA Diversion Chamber #33 (DC#33). The system will contain/trap solids & floatables in the event of a CSO (combined sewer overflow) during wet weather / heavy rainfalls. The project will include but not be limited to procurement & setting of pre-cast concrete vault, fabrication & installation/assembly of stainless steel netting system components, excavation, piping, backfilling, compaction, pavement restoration, etc. All labor, tools, equipment and materials for the project shall be provided by the contractor.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents