Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

2022 Crack Sealing and Road Preservation Program
Infrastructure
Bidding
Hudson, OH

Brandywine Road Phase 2 and 3
Infrastructure
Bidding
$1,693,780 est. value
Hudson, OH

Spot Safety - D04 PSIP Phase 2
Post-Bid
Akron, Canton, Youngstown, OH

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Major Reconstruction - SR 8/IR 76/IR 77-00.63/09.74/08.42
Results
Akron, OH 44301

Hudson Aurora Road/Hudson Park Drive and SR 91/Church Street/Park Lane Crosswalk Enhancements
Results
Hudson, OH 44236

Massillon Road at Boettler Road & Corporate Woods Roundabouts
Infrastructure
Bidding
$7,898,132 est. value
Green, OH

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

Fairlawn Corporate Parkway Extension
Results
Less than $555,000 est. value
Fairlawn, OH

Twinsburg Heights Allotment Road Improvement Project Phase 18
Infrastructure
Bidding
Twinsburg, OH

Corporate Woods Circle/Boettler Road
Infrastructure
Post-Bid
$6,077,914 est. value
Green, OH 44685

2021 Asphalt Resurfacing and Patching Program
Results
$3,159,012 est. value
Hudson, OH

2022 Road Program
Infrastructure
Bidding
$650,000 est. value
New Franklin, OH

White Pond Road Resurfacing (CH 317)
Infrastructure
Post-Bid
$1,085,382 est. value
OH

Reported 03/18/2022 12:00 AM
Project Title

Two Lane Resurfacing - SUM-SR 93/SR 162-09.10/07.26

Physical Address View project details and contacts
City, State (County) Akron, OH   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status
Bids Due View project details and contacts
Estimated Value $2,095,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For Improving Various Sections In The City Of Akron, In Summit County, Ohio, In Accordance With Plans And Specifications By Performing Pavement Repairs, Resurfacing Roadway With Fine Graded Polymer Asphalt Concrete, Applying Pavement Markings, And Performing All Related Work. Section Line Item Code Item Description Unit Quantity 0001 Roadway Alt Wt 0001 202e30000 Walk Removed (Wt: Nr) Nr Sf 11,518.000 0002 203e10000 Excavation (For Pavement Repair) (Wt: 06) 06 Cy 140.000 0003 203e10000 Excavation (For Walk Or Curb Ramp Installation) (Wt: 06) 06 Cy 421.000 0004 203e40000 Borrow (Wt: 06) 06 Cy 6.000 0005 608e10000 4" Concrete Walk (Wt: 38) 38 Sf 567.000 0006 608e52000 Curb Ramp (Wt: 38) 38 Sf 10,777.000 0007 608e53020 Detectable Warning (Wt: 38) 38 Sf 24.000 0008 623e39501 Monument Box Adjusted To Grade, As Per Plan (Wt: Nr) Nr Each 42.000 0009 625e31600 Pull Box, Misc.: Adjusted To Grade (Wt: 43) 43 Each 3.000 Section Line Item Code Item Description Unit Quantity 0002 Erosion Control Alt Wt 0010 659e10000 Seeding And Mulching (Wt: 46) 46 Sy 152.000 0011 832e30000 Erosion Control (Wt: 08) 08 Each 3,000.000 Section Line Item Code Item Description Unit Quantity 0003 Drainage Alt Wt 0012 611e98630 Catch Basin Adjusted To Grade (Wt: 35) 35 Each 80.000 0013 611e98634 Catch Basin Reconstructed To Grade (Wt: 35) 35 Each 15.000 0014 611e99654 Manhole Adjusted To Grade (Wt: 35) 35 Each 4.000 0015 611e99655 Manhole Adjusted To Grade, As Per Plan (Wt: 35) 35 Each 145.000 0016 611e99820 Special - Miscellaneous Metal (Wt: 35) 35 Lb 600.000 Section Line Item Code Item Description Unit Quantity 0004 Pavement Alt Wt 0017 251e01000 Partial Depth Pavement Repair (441) (Wt: 16) 16 Sy 2,500.000 0018 252e01500 Full Depth Pavement Sawing (Wt: 15) 15 Ft 4,800.000 0019 253e01000 Pavement Repair (Wt: 16) 16 Sy 300.000 0020 254e01000 Pavement Planing, Asphalt Concrete (t = 2") (Wt: 13) 13 Sy 83,679.000 0021 255e10500 Full Depth Pavement Removal And Rigid Replacement, Class Rrcm Sy 500.000 (Wt: 17) 17 0022 304e20000 Aggregate Base (Wt: 09) 09 Cy 140.000 0023 407e20000 Non-Tracking Tack Coat (Wt: 10) 10 Gal 10,880.000 0024 424e10001 Fine Graded Polymer Asphalt Concrete, Type a, As Per Plan (Wt: 10) 10 Cy 1,665.000 0025 441e50000 Asphalt Concrete Surface Course, Type 1, (448), Pg64-22 (Wt: 10) 10 Cy 215.000 0026 441e50200 Asphalt Concrete Intermediate Course, Type 1, (448) (Wt: 10) 10 Cy 2,906.000 0027 609e12000 Combination Curb And Gutter, Type 2 (Wt: 38) 38 Ft 18.000 0028 609e26000 Curb, Type 6 (Wt: 38) 38 Ft 166.000 Section Line Item Code Item Description Unit Quantity 0005 Water Work Alt Wt 0029 638e10800 Valve Box Adjusted To Grade (Wt: 35) 35 Each 7.000 0030 638e10801 Valve Box Adjusted To Grade, As Per Plan (Wt: 35) 35 Each 90.000 Section Line Item Code Item Description Unit Quantity 0006 Traffic Control Alt Wt 0031 646e01650 Bike Lane Arrow, Type 1 (Wt: 45) 45 Each 49.000 0032 646e10010 Edge Line, 6" (Wt: 45) 45 Mile 1.750 0033 646e10110 Lane Line, 6" (Wt: 45) 45 Mile 0.660 0034 646e10200 Center Line (Wt: 45) 45 Mile 3.580 0035 646e10300 Channelizing Line, 8" (Wt: 45) 45 Ft 21,190.000 0036 646e10400 Stop Line (Wt: 45) 45 Ft 409.000 0037 646e10510 Crosswalk Line, 12" (Wt: 45) 45 Ft 2,494.000 0038 646e10600 Transverse/Diagonal Line (Wt: 45) 45 Ft 224.000 0039 646e10800 Island Marking (Wt: 45) 45 Sf 339.000 0040 646e20110 School Symbol Marking, 96" (Wt: 45) 45 Each 2.000 0041 646e20300 Lane Arrow (Wt: 45) 45 Each 68.000 0042 646e20504 Dotted Line, 6" (Wt: 45) 45 Ft 590.000 0043 646e20600 Bike Lane Symbol Marking (Wt: 45) 45 Each 49.000 0044 646e20800 Yield Line (Wt: 45) 45 Ft 34.000 0045 646e60100 Green Colored Pavement For Bike Lanes (Wt: 45) 45 Sf 2,448.000 Section Line Item Code Item Description Unit Quantity 0007 Maintenance Of Traffic Alt Wt 0046 614e11111 Law Enforcement Officer With Patrol Car For Assistance, As Per Hour 350.000 Plan (Wt: 39) 39 0047 614e12460 Work Zone Marking Sign (Wt: 39) 39 Each 40.000 0048 614e13000 Asphalt Concrete For Maintaining Traffic (Wt: 39) 39 Cy 20.000 0049 614e18601 Portable Changeable Message Sign, As Per Plan (Wt: 39) 39 Snmt 12.000 0050 614e20110 Work Zone Lane Line, Class i, 6", 642 Paint (Wt: 39) 39 Mile 8.520 0051 614e20560 Work Zone Lane Line, Class Iii, 6", 642 Paint (Wt: 39) 39 Mile 0.660 0052 614e21100 Work Zone Center Line, Class i, 642 Paint (Wt: 39) 39 Mile 7.160 0053 614e21550 Work Zone Center Line, Class Iii, 642 Paint (Wt: 39) 39 Mile 3.580 0054 614e22360 Work Zone Edge Line, Class Iii, 6", 642 Paint (Wt: 39) 39 Mile 1.750 0055 614e23200 Work Zone Channelizing Line, Class i, 8", 642 Paint (Wt: 39) 39 Ft 19,200.000 0056 614e23680 Work Zone Channelizing Line, Class Iii, 8", 642 Paint (Wt: 39) 39 Ft 21,190.000 0057 614e26200 Work Zone Stop Line, Class i, 642 Paint (Wt: 39) 39 Ft 704.000 0058 614e26610 Work Zone Stop Line, Class Iii, 642 Paint (Wt: 39) 39 Ft 409.000 Section Line Item Code Item Description Unit Quantity 0008 Incidentals Alt Wt 0059 103e05000 Premium For Contract Performance Bond And For Payment Bond Ls 1.000 (Wt: Nr) Nr 0060 614e11000 Maintaining Traffic (Wt: 39) 39 Ls 1.000 0061 619e16010 Field Office, Type b (Wt: Nr) Nr Mnth 8.000 0062 623e10000 Construction Layout Stakes And Surveying (Wt: Nr) Nr Ls 1.000 0063 624e10000 Mobilization (Wt: Nr) Nr Ls 1.000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents