Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Metro Center - Master Plan
New Construction
Design
Aurora, CO 80012

Metro Center - Parcel A
New Construction
Design
Aurora, CO 80012

Scour Mitigation for Two Twin Structures
Infrastructure
Bidding
$5,000,000 CJ est. value
Aurora, CO 80019

Chambers Road Over Sand Creek Bridge Rehabilitation
Infrastructure
Bidding
$300,000 CJ est. value
Aurora, CO 80011

Riser Rings
Term Contract
Post-Bid
CO

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

On-Site Improvements
Results
Greenwood Village, CO 80111

On Call Construction Services - Urgent Water Pipeline Repair
Results
Englewood, CO

Legacy at Metro Center
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Aurora, CO 80011

Centennial Medical Plaza
New Construction, Renovation, Infrastructure - 61,000 SF
Pending Verification
$7,000,000 CJ est. value
Centennial, CO 80112

Metro Center - Parcel B
New Construction
Design
Aurora, CO 80017

McArthur Ditch Water Diversion
Infrastructure
Bidding
$622,897 CJ est. value
Aurora, CO 80011

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

2021 Alley Grading and Stabilization
Results
$350,000 to $400,000 est. value
Englewood, CO

Last Updated 08/16/2022 06:02 PM
Project Title

Sanitary Sewer Collection System Replacement Phase 1A

Physical Address View project details and contacts
City, State (County) Greenwood Village, CO 80121   (Arapahoe County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $361,370 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 16, 2022 this project has not yet been awarded. A timeline for award has not yet been established.** The Project includes the following Work: The Project consists of installation and extension of twenty-four (24) - 4 existing sanitary sewer services with new services connecting to Sanitary Sewer Collection System Replacement - Phase 1 with service line stub-outs that were installed in 2019. This work also includes a bid alternate for extending the 8 PVC sanitary sewer main 337 LF south along N. Main Street from existing MH 5A, and includes 3 new manholes. The Project consists of installation and extension of twenty-four (24) - 4" existing sanitary sewer services with new services connecting to Sanitary Sewer Collection System Replacement - Phase 1 with service line stub-outs that were installed in 2019. This work also includes a bid alternate for extending the 8" PVC sanitary sewer main 337 LF south along N. Main Street from existing MH 5A, and includes 3 new manholes.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents