Similar Projects
Resurfacing of CR-229S
Results
Macclenny, FL 32063

Nursery Boulevard Paving
Results
Macclenny, FL 32063

CR 127 Rehabilitation Project - Phase 1
Post-Bid
FL

Asphalt Repair
Bidding
$350,000 est. value

Asphalt Repair
Results
Less than $300,000 est. value

I-10 Rest Area Reconstruction
Results

Contract tro Supply Materials, Equipment, Labor and Incidentals to Remove, Reconstruct dnd Dispose of Concrete Ditch Pavement, Concrete Driveways & Gutter
Results
Less than $120,000 est. value
Lake City, FL 32024

Asphalt Repair
Results
$350,000 est. value

Paving/Resurfacing of Reid Stafford Road - Phase II (Section A)
Post-Bid
FL 32040

Asset Maintenance Contract for I-75 and I-10 for Lake City OPS
Results
Less than $35,000,000 est. value
Lake City, FL 32024

OC Horne Road Paving - Phase 1
Results
Macclenny, FL 32063

Hot Plant-Mixed Bituminous Courses, Grading, Flexible Paving
Results

County Road 23A from CR 125 to SR 121
Results
Macclenny, FL 32063

CR 125 South Widening and Resurfacing
Results
FL

Roadway Signing, Traffic Signal
Results
Less than $1,500,000 est. value

Last Updated 11/20/2019 01:14 PM
Project Title

Repaving/Resurfacing of Reid Stafford Road Phase I

Physical Address View project details and contacts
City, State (County) Macclenny, FL 32040   (Baker County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,209,204
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the full depth pavement construction/reconstruction of approximately 2.3 miles of the east end of Reid Stafford Road from west of Smokey Road to CR 125. Major work items include: (1) pavement construction/reconstruction; (2) cross drain/side drain replacements; (3) construction of driveway aprons; (4) painted traffic markings; and (5) installation of roadway signage. Project Location: The project extends 2.3 miles west along Reid Stafford Road from the CR 125 intersection 1,000 ft south of I-10.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents