Similar Projects
Fire Districts New Fire Station Number 61
Renovation
Bidding
Less than $4,300,000 est. value
Broomfield, CO

Fire Station 23 & Radio Shop Construction
Renovation - 3,360 SF
Bidding
Colorado Springs, CO 80910

New Fire Barn No. 2
Post-Bid
Less than $3,000,000 est. value
Boulder, CO 80304

Colorado Law Enforcement Training Center Firing Range
Post-Bid
Grand Junction, CO 81503

Detention Center Main Kitchen & Staff Dining Remodel
Results
Less than $200,000 est. value
Brighton, CO 80601

Police Station 2nd Floor Renovation
Renovation
Results
Black Hawk, CO 80422

New Fire Station
Construction
Falcon, CO 80831

Design and Construction of Training Tower
Construction
Less than $1,500,000 est. value
Durango, CO 81301

Fort Lupton Fire Station 3 County Road 8 & Future Rollie Avenue
New Construction
Post-Bid
Less than $6,750,000 est. value
Fort Lupton, CO

Downtown Fire Station Site
Results
Steamboat Springs, CO

Station 2 Construction Project
New Construction - 10,650 SF
Construction
Eaton, CO 80615

Fire Station #4 Renovation
Post-Bid
Poncha Springs, CO 81242

Design for Fire Station in Crested Butte
Results
Crested Butte, CO

Delta County Sheriffs Office Rifle Range Construction
Post-Bid
Delta, CO 81416

Hartsel Ambulance Station Project
New Construction - 5,600 SF
Results
Less than $1,650,000 est. value
Hartsel, CO 80449

Reported 04/20/2021 12:00 AM
Project Title

Construct a Detached Fire Station Support Building at Turkey Creek Complex

Physical Address View project details and contacts
City, State (County) Colorado Springs, Fort Carson, CO 80913   (El Paso County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes a Fire Station Support Building apparatus bays; a residential area with five dorm rooms, kitchen, exercise area, and a day room; and an administration area for basic operations, communications, and training. This project will include emergency back-up power for the apparatus bay lighting and doors, communication functions, and all associated equipment. Support facilities include POV parking, sidewalks, lighting, and landscaping.

Details

Fire/Police Station, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents