Similar Projects
Seventh Street Sinkhole Repair Project
Bidding
Oakmont, PA 15139

Walker Park Stream Restoration
Bidding
Edgeworth, PA

Corrugated Metal Pipe
Post-Bid
Pittsburgh, PA 15123

Semicir Street Landslide Remediation
Post-Bid
Pittsburgh, PA 15214

Doyle Avenue Landslide Repair
Results
PA

Scott Township CD 44 7.5 Georges Run Stream Restoration
Results
Pittsburgh, PA

Mon Wharf Connector, DGS 107-7, PH 5 (FD) - General Construction
Bidding
$1,000,000 est. value
Pittsburgh, PA

Reinforced Concrete Products
Post-Bid
Monroeville, PA

Carrie Furnace Redevelopment Project - Western Phase
Results
$1,300,000 to $1,500,000 est. value
Monroeville, PA 15146

Airfield Drainage Improvements at Allegheny County Airport
Bidding
West Mifflin, PA 15122

Cowley Park Landslide Remediation
Post-Bid
Pittsburgh, PA 15219

War Memorial Culvert Replacement
Results
Sewickley, PA 15143

Bairdford Park Master Plan Construction B-1 Ballfield Project
Post-Bid
$85,000 est. value
Cheswick, PA 15024

Site Drainage Improvements to the Brentwood Middle/High School
Results
Pittsburgh, PA 15227

Combined Sewer Overflow Debris Control
Post-Bid
$30,000 est. value
Etna, PA 15223

Reported 04/08/2021 12:00 AM
Project Title

Streambank Restoration on Crouse Run Along Sample Road, From the Confluence with Pine Creek to Just Downstream of Royalview Drive

Physical Address View project details and contacts
City, State (County) Allison Park, PA 15101   (Allegheny County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work included in the project is the removal of deposited stone, sediment, and other debris within the stream channel, the installation of turf reinforcement matting and grading on stream banks, floodplain areas, and portions of the stream channel. Work also includes the installation of low impact vegetated retaining wall system to stabilize a portion of the stream bank as well as J-Hook Rock Vanes to properly redirect stream flows. The Project also includes hard armoring via stone rip-rap at strategic locations along the stream bank. Project also includes the installation of vegetated solutions on the stream bank as well as seeding and mulching of all disturbed areas including all those areas disturbed for access to the various work areas in and around private residential properties. Received bids will be publicly opened and read aloud immediately thereafter.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents