Similar Projects
Last Updated | 02/07/2022 12:35 PM |
Project Title | Murray Fork Drive, Nato Road, Livermore Drive |
Physical Address | View project details and contacts |
City, State (County) | Fayetteville, NC 28314 (Cumberland County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Highway Signs/Guardrails/Barriers, Sidewalks/Parking Lot, Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Three following DAP Projects: 255 Murray Fork Drive, 3412 Nato Road, and 261 Livermore Street. 255 Murray Fork Drive: This Project is located at 255 Murray Ford Drive in Fayetteville, NC. It consists of removing approximately 120LF of existing 30-inch RCP and replacing with 30-inch HDPE, as well as adding a concrete collar around the existing open throat catch basin. Approximately 0.1 of an acre of the sites land will be disturbed for the replacement of the storm pipe, open throat, and access lanes as shown within the limits of construction on the plans. All disturbed areas will be seeded/sodded, and vegetatively stabilized as required. Temporary silt fence will be placed as required to inhibit the flow of stormwater runoff onto site and prohibit the flow of sediment off site. 3412 Nato Road: This project involves the removal of an existing inlet & manhole, plugging existing 15” RCP, installation of three new curb inlets, installation of new 15” RCP in roadway and new 18” HDPE in yard. Additionally, a concrete headwall will be installed at the south end of the back yard with a rip rap dissipator. This project area is located at 3412 Nato Road in Fayetteville, NC. Approximately 0.11 acre of the sites land will be disturbed for the construction as shown within the limits of construction on the plans. All disturbed areas will be sodded, and vegetatively stabilized or stabilized with pavements as shown or required. 261 Livermore Street: This project involved the repair of the existing storm drain inlet, concrete apron, and portion of the adjacent residential driveway at the end of Livermore Drive. Additionally, lining of the upstream and downstream storm pipes will also be performed. This project area is located on Livermore Drive in Fayetteville, NC. Approximately 0.XX of an acre of the sites land will be disturbed for the construction as shown within the limits of construction on the plans. All disturbed areas will be seeded/ sodded, and vegetatively stabilized or stabilized with pavements as shown or required. Inlet protection and temporary silt fence will be placed within the limits of construction at strategic locations to inhibit the flow of stormwater runoff onto site and prohibit the flow of sediment off site. |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |