Similar Projects
Annual Thermo Installations - Various Routes - Division 6
Term Contract, Infrastructure
Bidding

Portable Speed Bumps
Term Contract
Post-Bid
Asheboro, Bailey, Boonville, Chadbourn, China Grove, Fayetteville, Garysburg, Gaston, Gatesville, Jackson, Jacksonville, Lexington, Maple, Marion, Marshall, Nags Head, New Bern, Polkton, Richlands, Stantonsburg, Trenton, Whiteville, Williamston, NC 27807

On Call Thermoplastic Markings Service (2022)
Term Contract
Post-Bid
Fayetteville, NC

Myers Recreation Center Parking Lot
Results
Fayetteville, NC 28305

Hay Street Sidewalk Replacement
Results
Fayetteville, NC 28302

Water/Sewer Service Installation
New Construction - 4,111 SF
Construction
Spring Lake, NC

99--Paratrooper Display Installation
Term Contract
Post-Bid
Fort Bragg, NC

Fayetteville Ballpark Entry Plaza Phase II
Results
Fayetteville, NC

Resurface Various Streets 2022 Phase II
Infrastructure
Post-Bid
Fayetteville, NC 28314

Trainer Drive Sidewalk
Results
Fayetteville, NC 28301

Reilly Road Sidewalk
Infrastructure
Post-Bid
Fayetteville, NC 28312

Asphalt Resurfacing and Stormwater Repair at Methodist College Soccer Complex Parking Lot and Access Road
Results
Fayetteville, NC 28311

On-Call Stormwater Control Measure Repair Services
Results

EWP DSR PROJECT #5038-501 FLEA MARKET
Renovation
Results
Fayetteville, NC

Sign Installation and Overlays - I-295, I-95 and NC 87
Results

Last Updated 02/07/2022 12:35 PM
Project Title

Murray Fork Drive, Nato Road, Livermore Drive

Physical Address View project details and contacts
City, State (County) Fayetteville, NC 28314   (Cumberland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Highway Signs/Guardrails/Barriers, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Three following DAP Projects: 255 Murray Fork Drive, 3412 Nato Road, and 261 Livermore Street. 255 Murray Fork Drive: This Project is located at 255 Murray Ford Drive in Fayetteville, NC. It consists of removing approximately 120LF of existing 30-inch RCP and replacing with 30-inch HDPE, as well as adding a concrete collar around the existing open throat catch basin. Approximately 0.1 of an acre of the sites land will be disturbed for the replacement of the storm pipe, open throat, and access lanes as shown within the limits of construction on the plans. All disturbed areas will be seeded/sodded, and vegetatively stabilized as required. Temporary silt fence will be placed as required to inhibit the flow of stormwater runoff onto site and prohibit the flow of sediment off site. 3412 Nato Road: This project involves the removal of an existing inlet & manhole, plugging existing 15” RCP, installation of three new curb inlets, installation of new 15” RCP in roadway and new 18” HDPE in yard. Additionally, a concrete headwall will be installed at the south end of the back yard with a rip rap dissipator. This project area is located at 3412 Nato Road in Fayetteville, NC. Approximately 0.11 acre of the sites land will be disturbed for the construction as shown within the limits of construction on the plans. All disturbed areas will be sodded, and vegetatively stabilized or stabilized with pavements as shown or required. 261 Livermore Street: This project involved the repair of the existing storm drain inlet, concrete apron, and portion of the adjacent residential driveway at the end of Livermore Drive. Additionally, lining of the upstream and downstream storm pipes will also be performed. This project area is located on Livermore Drive in Fayetteville, NC. Approximately 0.XX of an acre of the sites land will be disturbed for the construction as shown within the limits of construction on the plans. All disturbed areas will be seeded/ sodded, and vegetatively stabilized or stabilized with pavements as shown or required. Inlet protection and temporary silt fence will be placed within the limits of construction at strategic locations to inhibit the flow of stormwater runoff onto site and prohibit the flow of sediment off site.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 10 - Specialties, Signage.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents