Similar Projects
Paving & Site Lighting
Post-Bid

Central Division – Asphalt Paving Maintenance
Post-Bid

1.62 MI of High Friction Surface Treatment, Signing and Pavement Markings on Mcculloch Road from Beaverton Road to Spicer Road and Hockaday Road from South of Weber Road to North of Weber Road
Results
MI

9.83 MI of Micro-Surfacing, Overband Crack Fill, Centerline Corrugations and Pavement Markings on M-61 from the Bay/Gladwin County Line East to the West City Limits of Standish
Results

9.71 MI of Hot Mix Asphalt Cold Milling And Resurfacing, Guardrail and Pavement Markings on M-30 from US-10 Westbound Off Ramp to Just North of the North Midland County Line
Results

Industrial Park Improvements Glidden Road Reconstruction
Results
Beaverton, MI

Saginaw Street Reconstruction Project
Results
Beaverton, MI

5.40 MI of Hot Mix Asphalt Micro Cold Milling and Ultra-Thin Resurfacing, Joint Repairs and Pavement Markings on M-18
Results
Beaverton, MI 48612

Mass Grading, Site, Site Utility, Paving and Building Work
Post-Bid
Gladwin, MI

HMA Overband Crackfill
Bidding
Gladwin, MI

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Construction of the South Arcade Street Reconstruction
Results
Gladwin, MI 48624

Calumet-Swedetown Trail Capping, And Route Grading
Post-Bid

Industrial Park Improvements - Glidden Road and Terry Diane Street Reconstruction
Results
Less than $1,500,000 est. value
Beaverton, MI

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Reported 03/19/2020 12:00 AM
Project Title

HMA Overband Crackfill

Physical Address View project details and contacts
City, State (County) Gladwin, MI   (Gladwin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Locations F-97 (Round Lake Road)- M-18 north to the county line - 6 miles Hockaday Road- M-61 north to Sugar River Road- 10.5 miles Sugar River Road- M-30 to F-97 – 6 miles Estey Road- M-30 east 4 Miles

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents