Similar Projects
DMC C Building Emergency Generator Replacement
Bidding
Milwaukee, WI 53233

Student Union Renovation - MEP
Bidding
$28,000,000 est. value
Milwaukee, WI 53211

Electrical Services
Term Contract
Post-Bid
Milwaukee, WI 53202

Wireless Access Points
Term Contract
Post-Bid
Milwaukee, WI 53205

GMIA Electrical Switchgear Replacement
Results
Milwaukee, WI

Preliminary Treatment Facility Electrical Upgrade
Results
Milwaukee, WI 53207

Purchase of Light Fixtures for South Division HS - Lobby 1-2 Lighting Upgrade
Post-Bid
Milwaukee, WI 53204

Electrical Service Upgrade - Audubon Multi-Plex
Results
Milwaukee, WI 53215

J059--Light Poles Removal/Replacement ONE TIME BUY
Post-Bid
Milwaukee, WI

Exterior, Gym Lighting, and Exit Sign Upgrades at Alexander Hamilton High School
Results
Milwaukee, WI 53220

Wauwatosa City Hall Solar Photovoltaic System
Post-Bid
Wauwatosa, WI 53213

Exterior and Gym Lighting Upgrades at Washington Complex
Results
Milwaukee, WI 53200

KK Tank House Electrical Upgrade
Term Contract
Post-Bid
Milwaukee, WI 53204

James Madison Academic Campus (JMAC) - Energy Conservation Corridor Ceiling And Lighting Upgrade
Results
Milwaukee, WI 53218

Channel Letter Signs
Renovation
Post-Bid
$10,000 est. value
West Allis, WI

Reported 05/04/2021 12:00 AM
Project Title

Low Voltage Switchgear

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53207   (Milwaukee County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Milwaukee Metropolitan Sewerage District (District) is seeking information from manufacturers or their distributors of low voltage switchgear for installation at the District’s Jones Island Water Reclamation Facility. One of the main goals of the Low Voltage Switchgear replacement is to install a replacement unit which will have a long service life. The proposed equipment line should be early in its design life cycle, but not introductory.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents