Similar Projects
Repairs and Maintenance of Private Road Crossing Railroad Tracks
Renovation
Post-Bid
Amsterdam, NY 12010

Safe Routes to School Project
Post-Bid
Interlaken, NY 14847

Design Build Services for I 390/I 490/31 (Lyell Ave) Interchange Improvements Phases 3 and 4
Term Contract
Results
Less than $85,000,000 est. value
NY

Rehabilitation of Folts Road - Cr 137
Results
Less than $1,000,000 est. value
Herkimer, NY 13350

Scofield Street Paving
Post-Bid
Walden, NY 12586

Rehabilitation of a Portion of Steuben Hill Road & Steuben Road - Cr 62
Results
Less than $500,000 est. value
Herkimer, NY 13350

Pedestrian Crossing Improvements – New Street
Post-Bid
Saratoga Springs, NY 12866

Rehabilitation of Inghams Mills Road CR 127
Term Contract
Results
Less than $650,000 est. value
Herkimer, NY

Main Street Green Infrastructure Improvement
Post-Bid
North Tonawanda, NY 14120

Croton-on-Hudson Parking Facility, Vehicular, Pedestrian and Bicycle Enhancements
Results
Croton-on-Hudson, NY 10520

North Road (CR 122) and Balsley Road Rehabilitation
Post-Bid
$1,000,000 to $3,000,000 est. value
Seneca Falls, NY 13165

Rehabilitation of a Portion of Travis Road CR 160
Term Contract
Results
Herkimer, NY

Pavement & Curb Replacement
Post-Bid
$2,300,000 to $2,900,000 est. value
Rochester, NY

Chelsea Service Line Connections and Road Repaving
Results
Wappingers Falls, NY

Various Highway Pavement Reclamation Processes
Term Contract
Post-Bid
Ballston Spa, NY 12020

Reported 05/12/2020 12:00 AM
Project Title

Road Work for 2020

Physical Address View project details and contacts
City, State (County) Gouverneur, NY 13642   (Saint Lawrence County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

River Road: (year of 2020) Approximately 1.1 miles 22’ wide x 3’’ over a profiled Road with type 3 Binder. Also, about 1.1 miles X 22’ wide X 1” compaction with type 6 starting at Town of Fowler Line and ending on River Road new Pavement from 2019. Both edges of this pavement shall be raked down to act as shoulders. New road is to be Fanned to marked area at Bay Road Bridge. Kilkarney Road: (year of 2020) Approximately .12 miles 20’ wide x 3’’ over a profiled Road with type 3 Binder. Also, about .12 miles X 20’ wide X 1” compaction with type 6 starting at State Highway 58 and ending at far end of turn around. Also, pave plow-turn around 36’ wide 60 ‘deep. Both edges of this pavement shall be raked down to act as shoulders. Turn around shall not be raked down. New road is to be Fanned to marked area on State Highway 58. Byrns Road: (year of 2020) Approximately 1 mile 18’ wide x 3’’ over a profiled Road with Special/Fine Binder. Road shall be fanned at intersection with County Route 22 and Swiss Hill to the White Markings. Byrns Road: (year of 2020) Approximately .9-mile 18’ wide x 3’’ over a profiled Road with Special/Fine Binder. Road shall be fanned at intersection with Shantyville Road and 90 Degree turn of Byrns Road.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents