Similar Projects
Last Updated | 07/25/2022 05:02 PM |
Project Title | Storm Hardening at Edgewater Park Volunteer Fire Department |
Physical Address | View project details and contacts |
City, State (County) | New York, NY 10465 (Bronx County) |
Category(s) | Government/Public |
Sub-Category(s) | Fire/Police Station |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | GG-X00735640-I1 The scope of this project shall include furnishing all qualified personnel, supervision, labor, services, materials, equipment, facilities, travel, overhead and incidentals necessary for Storm Hardening of the Edgewater Park Volunteer Fire Department. The work to be performed by the Bidder for this project shall include, but is not limited to: Location: Edgewater Park Volunteer Fire Department 1 Adee Drive, Edgewater Park, NY Construction services for Storm Hardening of the Edgewater Park Volunteer Fire Department. New windows installed throughout the entire building Improvements to the roof and building envelope that includes new roofing, flashings, and waterproofing Installation of a backup generator to provide emergency power and allow the facility to serve as a shelter during emergencies. The generator will be of sufficient capacity to provide accessory usage for emergency equipment Upgraded HVAC installed in the community center Complete renovation of the community center, including modern lighting, finishes, upgraded HVAC, and ADA-compliant bathrooms so that the facility can function as a generator-driven emergency shelter and build community resilience. Furnish and install construction signage per Appendix G "Construction Signage Requirements" The contractor shall perform all contract work such that on-going use of the firehouse remain unaffected and shall be operational at all times. This shall include all MEP systems, access to egress points, or otherwise approved in the site logistics plans. Warranty period shall not be less than one (1) year, to include labor and materials. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 15% Women Owned Sub-Contracting Goal: 15% 5% bid bond required. Contract term: 6 months |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |