Last Updated | 11/15/2022 03:34 AM |
Project Title | Region 3 HQ New Mat Lab Building |
Physical Address | View project details and contacts |
City, State (County) | Roseburg, OR 97470 (Douglas County) |
Category(s) | Heavy and Highway, Laboratory, Sewer and Water |
Sub-Category(s) | Laboratory, Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $634,900 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | AGENCY HAS LIMITED FUNDING AVAILABLE FOR CONSTRUCTION OF THIS PROJECT AND THE FUNDING MAY NOT BE ADEQUATE TO CONSTRUCT THE ENTIRE PROJECT. NINE (9) ADDITIVE ALTERNATES ARE BEING USED TO MAXIMIZE THE WORK THAT CAN BE COMPLETED WITHIN THE AVAILABLE FUNDING LIMITS. ADDITIVE ALTERNATES WILL BE SELECTED IN THE NUMERICAL ORDER IN WHICH THEY ARE LISTED BELOW, THAT REPRESENTS THE PRIORITY FOR COMPLETING THE WORK. THE CONTRACT AWARD WILL BE AS DESCRIBED IN THE INVITATION TO BID ATTACHMENT C--BID PRICING FORM. BASE BID INCLUDES ALL WORK INCLUDED IN THE CONSTRUCTION DOCUMENTS EXCLUDING THE WORK DESCRIBED IN THE ADDITIVE ALTERNATES BELOW. BASE BID INCLUDES ALL BELOW FLOOR AND BELOW GRADE ROUGH-IN ITEMS SUCH AS PLUMBING, FLOOR DRAINS, TRAP PRIMER CONNECTS AND UTILITY TRENCHING. ADD ALTERNATE #1 FURNISH AND INSTALL HVAC SYSTEM ADD ALTERNATE #2 FURNISH AND INSTALL GYPSUM CEILING THROUGHOUT ENTIRE BUILDING. FURNISH AND INSTALL ATTIC ACCESS HATCH. TAPE AND TEXTURE ACCORDING TO THE INTERIOR FINISH SCHEDULE AND AS SPECIFIED IN SPECIFICATION SECTION 09 29 00 GYPSUM BOARD. ADD ALTERNATE #3 FURNISH AND INSTALL GLASS FIBER BLANKET INSULATION IN EXTERIOR WALLS OF ROOMS 100, 101, 102, 103, 104, 105 and COMM ROOM 107. FURNISH AND INSTALL MINERAL-WOOL SOUND ATTENUATION BLANKETS IN INTERIOR WALLS. FURNISH AND INSTALL PNEUMATICALLY APPLIED LOOSE-FILL MINERAL FIBER CEILING INSULATION THROUGHOUT. ADD ALTERNATE #4 FURNISH AND INSTALL GYPSUM WALL BOARD THROUGHOUT IN WALLS OF ROOMS 100, 101, 102, 103, 104, 105 AND INTERIOR OF COMM ROOM 107. TAPE, TEXTURE AND PAINT ALL GYPSUM WALL BOARD ACCORDING TO THE INTERIOR FINISH SCHEDULE AND AS SPECIFIED IN SPECIFICATION SECTION 09 29 00 GYPSUM BOARD THROUGHOUT. ALTERNATE #5 FURNISH AND INSTALL ALL INTERIOR DOOR FRAMES, DOORS AND TRIM. ALTERNATE #6 FURNISH AND INSTALL INTERIOR FLOORING FINISH AND WALL BASE IN ROOMS 100, 101, 102, 103, 104, 105 and COMM ROOM 107 AS INDICATED ON THE INTERIOR FINISH SCHEDULE. ALTERNATE #7 FURNISH AND INSTALL ALL PLUMBING FIXTURES, WATER HEATER, ADA COMPONENTS, TOILET ROOM ACCESSORIES, CASEWORK, WOOD TRIM AND BLINDS THROUGHOUT. PAINT WOOD SURFACES AS NOTED IN THE INTERIOR FINISH SCHEDULE. ALTERNATE #8 FURNISH AND INSTALL GLASS FIBER BLANKET INSULATION IN EXTERIOR WALLS OF ROOM 106. ALTERNATE #9 FURNISH AND INSTALL GYPSUM WALL BOARD IN ROOM 106. TAPE, TEXTURE AND PAINT ALL GYPSUM WALL BOARD ACCORDING TO THE INTERIOR FINISH SCHEDULE AND AS SPECIFIED IN SPECIFICATION SECTION 09 29 00 GYPSUM BOARD THROUGHOUT. FURNISH AND INSTALL WALL BASE IN ROOM 106AS INDICATED ON THE INTERIOR FINISH SCHEDULE. |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |