Similar Projects
Jones Sausage Road Industrial Development
New Construction
Conception
$1,000,000 est. value
Garner, NC 27529

Mitchell Mill Road Self Storage Facility
New Construction
Conception
$1,000,000 est. value
Raleigh, NC 27616

Traditions Grande Care Facility
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Wake Forest, NC 27587

New Fire Station 3 - City of Raleigh
New Construction, Infrastructure - 11,749 SF
Design
$11,500,000 CJ est. value
Raleigh, NC 27601

Falls Lake Water and Sewer Line Connection
Infrastructure
Bidding
$1,000,000 CJ est. value
Wake Forest, NC 27587

Creech Road Tennis Court Reconstruction Project
Infrastructure
Bidding
$3,000,000 CJ est. value
Garner, NC 27529

E-44 Hilltop Needmore Elementary School - Early Procurement Package
New Construction, Infrastructure - 132,346 SF
Sub-Bidding
$50,124,186 CJ est. value
Fuquay Varina, NC 27526

Request to Prequalify Vendors For Residential Asbestos Abatement Services
Term Contract, Infrastructure
Post-Bid
$200,000 CJ est. value
Raleigh, NC 27603

U-4437 Beryl Road Site Modifications
Infrastructure
Post-Bid
Raleigh, NC 27600

DPS-ABC Commission Warehouse Rack Addition
Renovation
Results
$150,000 to $350,000 est. value
Raleigh, NC 27610

Archives and History Building Foundation Repairs and Drainage Improvements
Renovation, Infrastructure
Results
$965,000 CJ est. value
Raleigh, NC 27601

Ferguson Distribution Center
New Construction - 100,000 SF
Construction
$12,900,000 est. value
Holly Springs, NC 27540

Schmalz Manufacturing Expansion
Addition - 53,031 SF
Construction
Raleigh, NC 27616

Project Real
New Construction, Infrastructure - 150,000 SF
Pending Verification
$16,000,000 CJ est. value
Apex, NC 27502

Project Real
New Construction, Infrastructure - 150,000 SF
Pending Verification
$16,000,000 CJ est. value
Apex, NC 27502

Last Updated 08/22/2022 01:31 PM
Project Title

Greenology Products Warehouse Expansion

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27615   (Wake County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Manufacturing/Processing Plant, Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 22, 2022, the project has been awarded. A timeline for construction has not been confirmed. Note: Bidders are requested to address questions to kristy@hobbsarchitects.com and thobbs@hobbsarchitects.com. Last day for questions is Tuesday June 22nd 2022 (one week prior to bid). The work includes a +/-3,700 addition to the existing warehouse portion of the Greenology Headquarters. A new pre-engineered metal building has been fabricated and is ready to be delivered to the site. Interior work includes new framed walls, restrooms, & HVAC installation, with miscellaneous interior renovation work and site improvements. Addendum #1-#6 have been issued as of 6-28-2022. Note from C.T. Wilson: Addendum 5 and 6 are about Zoom links to the bid opening. Please have bids sent to me by no later than 2:00 PM. My bid must be emailed by 2:30 pm tomorrow. Thanks, Kevin Hartzog kevin.hartzog@ctwilson.com (919) 808-1925 *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

3,640 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents