Similar Projects
2021 Plant Mix
Results
Less than $2,400,000 est. value

Milling and Paving
Term Contract
Post-Bid
Manassas, VA

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Results
$110,000 to $180,000 est. value

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Results
$110,000 to $180,000 est. value

Copy Of Hdpe Lining For Matal Pipe
Infrastructure
Bidding

On-Call Emergency Soil Repair
Term Contract
Results

Case Coal, Llc Bond Forfeiture
Alteration
Post-Bid
$110,000 to $180,000 est. value
Duffield, VA 24244

Incidental Asphalt Repair
Term Contract
Results
Dumfries, Gainesville, Lake Ridge, Manassas, VA 20155

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Design
Less than $75,000,000 est. value
Washington, DC

Route 28 Widening Project
Post-Bid
$11,681,000 est. value
Manassas, VA

Philpott Landslide Construction/Repairs
Post-Bid
$5,000,000 to $10,000,000 est. value

Parking Lot Improvement
Post-Bid
Manassas, VA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Water Activated Cold Patch
Term Contract
Results

Reported 07/22/2021 12:00 AM
Project Title

Dumfries Road Shared Use Path

Physical Address View project details and contacts
City, State (County) Manassas, VA 20110   (Manassas City County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of the Dumfries Road Shared Use Path Project. Generally, the Project includes construction of a shared use path along the west side of Dumfries Road from Donner Drive to Hastings Drive. Part of the shared use-paths shall connect to approximately 400 linear feet of path (designed and constructed by others) at the new Rescue and Fire Station 21 property. Work includes, but is not limited to, the installation of erosion control devices, clearing and grubbing, grading, excavation, installing storm sewers pipes and drainage structures including extensions of three (3) 42”x29” existing corrugated metal pipes, curb and gutter, placing aggregate, asphalt paving, pedestrian facilities, railing, installation of traffic signage and pavement markings, and all measures required for the maintenance of traffic during construction.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents