Similar Projects
Amador / Newport
New Construction, Infrastructure - 6,400 SF
Design
$2,000,000 CJ est. value
Newport, KY 41071

Amador / Newport
New Construction, Infrastructure - 6,400 SF
Design
$2,000,000 CJ est. value
Newport, KY 41071

Highland Heights and Silver Grove Pump Stations Improvements
Infrastructure, Renovation
Bidding
$2,000,000 CJ est. value
Highland Heights, KY 41076

Highland Heights and Silver Grove Pump Stations Improvements
Infrastructure, Renovation
Bidding
$2,000,000 CJ est. value
Highland Heights, KY 41076

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Bellevue and Dayton Joint Roadway Resurfacing
Infrastructure
Post-Bid
Dayton, KY 41074

Campbell County High School Paving Improvements 2021
Results
Less than $185,000 est. value
Alexandria, KY 41001

Asphalt Resurfacing
Infrastructure
Results
KY

Gloria Terrell Drive Industrial Development
New Construction, Infrastructure - 350,000 SF
Pending Verification
$40,000,000 CJ est. value
Highland Heights, KY 41076

Gloria Terrell Drive Industrial Development
New Construction, Infrastructure - 350,000 SF
Pending Verification
$40,000,000 CJ est. value
Highland Heights, KY 41076

Campbell Call 108
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Alexandria, KY 41001

Resurfacing - Fall 2021
Infrastructure
Results
KY

Newport Multi-Residential
New Construction, Infrastructure
Pending Verification
$320,000,000 CJ est. value
Newport, KY 41071

33 N. Ft. Thomas Ave. Wall Facing
Infrastructure
Post-Bid
$200,000 CJ est. value
Fort Thomas, KY 41075

Asphalt Resurfacing
Infrastructure
Results
KY

Last Updated 11/18/2022 05:08 PM
Project Title

Bid Package #2 Concrete Alley Full Removal and Replacement Gugel Alley from 6th Street to 8th Street

Physical Address View project details and contacts
City, State (County) Newport, KY 41071   (Campbell County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $148,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The specifications and bid documents are all contained in this booklet. The contractor must clean around each manhole cover, valve or other item showing in the surface to a depth of two inches. The new concrete surface must match the elevation of the item showing in the surface. If, for any reason, the existing surface elevation of the item showing in the surface must be adjusted, it shall be done at no additional cost to the City. This paving is being bid at a price per square yard in place. Final payment will be made at the unit price per square yard times the square yards of paving constructed. This bid package contains an alley constructed of concrete paving. When removing the concrete paving the contractor will excavate and remove the concrete paving subgrade to a depth of 7 inches below the existing surface. After excavation, the contractor must notify the engineering to allow the subgrade to be inspected and tested. New full depth concrete must be constructed with 7 inches of 4000 psi concrete in the excavated area. The surface of the new paving must match the existing surface.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents