Similar Projects
Last Updated | 12/28/2021 02:45 PM |
Project Title | Z1da--Retro-Commissioning Mechanical Corrections |
Physical Address | View project details and contacts |
City, State (County) | Lebanon, PA (Lebanon County) |
Category(s) | Single Trades |
Sub-Category(s) | Mechanical |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 to $2,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Retro-Commissioning Mechanical Corrections and Construction Services related to the Retro-Commissioning Mechanical Corrections construction project located at the Lebanon VA Medical Center, 1700 S Lincoln Avenue, Lebanon, PA 17042. Replacement of AC-9-1: This cooling-only air handling unit (AHU) is positioned at high level in the Penthouse of Building 1 and cools the elevator machinery. The unit shall be replaced in kind and a new duct main shall be installed. All ductwork branches shall remain unchanged, as practical. New AHU suspension structure and a new hoist hook shall be installed in the Penthouse. The existing Chilled Water (CHW) piping shall be fitted with manual valves allowing AC-9-1 to be isolated without inhibiting the operations of the adjacent AHU. Part of the (CHW) piping shall be relocated so that it does not pass over the top of an existing electrical cabinet. The thermostat shall be relocated from the exterior wall to the column near the elevator machine room. Replacement of AC-1-24: The existing AHU serving the Gym in Building 24 is positioned at high level and shall be removed entirely, including all supply air ductwork. A new AHU shall be installed in the store room, which shall be repurposed to serve as a mechanical room. The new AHU shall include CHW cooling and steam heating coils, including condensate pump. A mixed air system shall be incorporated, including a return fan at high level. New exhaust hardware shall be included. Ductsox shall be used for supply air, which is positioned at high level above the Gym space. Replacement of ERU-1-22: The existing energy recovery unit (ERU) positioned on the flat roof of Building 22 shall be replaced in kind. This shall include the installation of occupancy sensors within the corridors at all three floors in Building 22, which allow energy-conservation control sequences to be implemented within the Building. The entire ventilation system within Building 22 shall be balanced upon the completion of a separate renovation project at the Second Floor of the Building. The existing toilet vent pipe shall be re-routed above roof level. |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |