Similar Projects
Lakeview Lane Culvert Replacement
Infrastructure
Design
$300,000 CJ est. value
Fayetteville, GA 30214

Lakeview Lane Culvert Replacement
Infrastructure
Design
$300,000 CJ est. value
Fayetteville, GA 30214

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Pedestrian Hybrid Beacon at North Peachtree Parkway Crossing at Kedron Boat Ramp
Infrastructure
Bidding
$400,000 CJ est. value
Peachtree City, GA 30269

Gutherie's / Peachtree
Demolition, New Construction, Infrastructure - 1,870 SF
Post-Bid
$575,000 CJ est. value
Peachtree City, GA 30269

Construction of a Bridge and Approaches on Ebenezer Church Road
Demolition, New Construction, Infrastructure
Post-Bid
$3,952,078 CJ est. value
Fayetteville, GA 30215

Agriculture Meter Installation
Infrastructure
Results

Water System Advanced Metering Infrastructure
Infrastructure
Results
GA

Lanier Avenue Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Fayetteville, GA 30214

MacDuff Parkway Mixed-Use Plan
New Construction, Infrastructure
Pending Verification
$13,579,200 CJ est. value
Peachtree City, GA 30269

SR 54 at SR 74
Infrastructure
Design
$6,000,000 CJ est. value
Peachtree City, GA 30269

Lakeview Lane Trenchless Rehabilitation
Infrastructure
Bidding
$250,000 CJ est. value
Fayetteville, GA 30214

Fayette County Department of Public Health Building
New Construction, Infrastructure - 36,951 SF
Post-Bid
$15,000,000 CJ est. value
Fayetteville, GA 30214

SR54 Water Main Crossing at Veterans Parkway
Infrastructure
Results
Fayetteville, GA 30215

Trilith Studios Expansion
Addition, New Construction, Infrastructure
Pending Verification
$66,000,000 CJ est. value
Fayetteville, GA 30214

Last Updated 02/17/2023 06:13 AM
Project Title

130 Braelinn Court Pipe Replacement Project

Physical Address View project details and contacts
City, State (County) Peachtree City, GA 30269   (Fayette County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $71,368 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Peachtree City will be receiving separate sealed Bids for all material, labor and equipment for the "130 Braelinn Court Pipe Replacement". This includes the following, with all related accessories as shown on the Construction Drawings and called for in the Contract Documents and Technical Specifications: The existing 18" diameter CMP stormwater drainage pipe adjacent to 130 Braelinn Court is severely corroded and the downstream end has partially collapsed. The scope of work for this project includes excavating and replacing the failing 18" CMP with 146 LF of 18" HDPE. This contract is locally funded. It is mandatory that all prospective bidders download the Project Manual and Construction Drawings from the website above. Each Bidder is responsible for checking the website above for any future Addendums and emailing the Purchasing Agent with any questions. Each Bidder must deposit with his bid, security in the amount of 5%, and shall be subject to the conditions provided in Section 00 21 13 "Instruction to Bidders." Each Bidder is required to submit a "Construction Contractors Qualification Statement", "Bid Security", "Bid Form", Non-Collusion Affidavit", and "Security and Immigration Compliance Affidavit" as outlined in Section 00 22 13 "Supplementary Instructions to Bidders." The contract will be awarded to the low, responsive, and responsible bidder with reservation of right to reject all bids. Bids may not be withdrawn by Bidders for 60 days following opening of the bids The project shall be Substantially Complete within 60 calendar days from the date of Notice to Proceed of the contract. Liquidated Damages shall be assessed in the amount of $200.00 per day for each calendar day required to achieve Substantial Completion. The project shall be Final Complete within 30 calendar days beyond Substantial Completion. Liquidated Damages shall be assessed in the amount of $200.00 per day for each calendar day required to achieve Final Completion. The City of Peachtree City provides assurances to Bidder that all anticipated Federal, State, and Local Permits along with anticipated Rights of Way and Easements have been obtained or will be obtained byN/A. The City of Peachtree City will not accept pre-bid project questions within a period of 120 hours prior to the advertised time for opening bids, excluding Saturdays, Sundays, and Peachtree City Legal Holidays. The City of Peachtree City will not issue or cause to be issued any addenda modifying the Project Manual or Construction Drawings within a period of 72 hours prior to the advertised time for opening bids, excluding Saturdays, Sundays, and Peachtree City Legal Holidays. Agreement will require a Payment Bond in the amount of 110%, and a Performance Bond in the amount of 100% of the project cost. The City of Peachtree City reserves the right to bid a project in phases and award the contract on the phases it deems to be in the City's best interest. Liquidated Damages shall be assessed in the amount of $200.00 per day

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents