Similar Projects
Roadway Construction to Serve Sienna Village of Destrehan Section 1
Post-Bid
$800,000 est. value
Missouri City, TX

Paving, Drainage, and Pedestrian Improvements for Trinity Drive - from Greenbriar Drive to 400 LF North of Bluebonnet Drive
Post-Bid
Stafford, TX 77477

City of Stafford General Street Repairs
Results
Stafford, TX 77477

Mason Road and Jack Road Street Dedication Section 1
Results
Less than $3,497,077 est. value
Katy, TX

Paving Facilities in Candela Section 8
Infrastructure
Post-Bid
$420,000 est. value
TX

Construction of the Paving and Appurtenances to Serve Kingsley Square Boulevard (from FCT to Bungalow Drive)
Results
Sugar Land, TX

Road Construction Improvements On Front Street for Fort Bend County Mobility Bond Project
Infrastructure
Post-Bid
Richmond, TX 77469

Bamore Road Expansion (I-69 to Stella Road)
Results
Rosenberg, TX

Construction of Voss Road at SH 6 Right Turn Lane
Infrastructure
Post-Bid
Sugar Land, TX 77498

Construction on Brandt Road from McCrary Road to Precinct Line Road Phase I
Results
Less than $1,698,735 est. value
Richmond, TX 77406

Construction of Right Turn Lane for Fry Road at Katy Gaston
Infrastructure
Post-Bid
Katy, TX 77494

Construction of Ransom Road Widening from West of Hudson Oaks Lane
Results
Less than $1,291,880 est. value
TX 77469

Construction of Right Turn Lane for Pin Oak at Katy Flewellen Road
Infrastructure
Post-Bid
Katy, TX 77494

Paving and Appurtenances to Serve Escondido Section 1 and Section 2
Results
Katy, TX

Prairie Parkway Extension
Infrastructure
Post-Bid
$800,000 est. value
Katy, TX 77450

Reported 07/13/2022 02:54 PM
Project Title

Chimney Rock Connection at Fort Bend Toll - N-100036 - City of Houston

Physical Address View project details and contacts
City, State (County) Missouri City, TX 77489   (Fort Bend County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $4,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a mixed-use development in Houston, Texas. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project. Project provides for acquisition, design and construction of a 2 lane, concrete roadway with sidewalks and necessary underground utilities. The project is included in the city's 2023-2027 Capital Improvement Program (CIP). As of July 12, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents