Similar Projects
Public Safety Building - PUBSF 24-01 - City of Waukee
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Waukee, IA 50263

Police Academy Improvements - BL095 - City of Des Moines
Addition, Demolition, Build-out, Renovation, Infrastructure
Conception
$850,000 CJ est. value
Des Moines, IA 50315

Readiness Center and SE Fire Station and Training Facility
New Construction
Design
$18,500,000 to $19,000,000 est. value
West Des Moines, IA

New Fire Station / City Hall - Missouri Valley City
New Construction, Infrastructure
Design
$2,400,000 CJ est. value
Missouri Valley, IA 51555

Police Department Addition and Renovations
Addition, Demolition, Renovation, Infrastructure - 5,800 SF
Bidding
$1,100,000 CJ est. value
Mount Vernon, IA 52314

RFQ Construction Manager at Risk - Construction of Its Fire Station No. 2
New Construction, Infrastructure
Bidding
Hiawatha, IA 52233

Readiness Center and SE Fire Station and Training Facility
LEED Certification, New Construction, Infrastructure - 114,004 SF
Post-Bid
$5,250,000 CJ est. value
West Des Moines, IA 50265

Sheriff`s Office Evidence And Storage Facility Being Constructed
New Construction, Addition
Post-Bid
Raymond, IA 50667

New Fire Station
New Construction
Results
$3,675,000 est. value
Solon, IA 52333

Emergent - Protivin Fire Station
New Construction - 6,600 SF
Results
Protivin, IA 52163

Ames Fire Station 2 Relocation
New Construction
Conception
Ames, IA

Fire Station - City of Fairfield
Build-out
Design
$6,000,000 CJ est. value
Fairfield, IA 52556

Fire Station Addition
Addition - 1,865 SF
Post-Bid
$710,600 est. value
Boone, IA 50036

Install Concrete Floor at PD Range Pole Building
Addition, Alteration
Results
Cedar Rapids, IA

Fire Station 4
New Construction
Conception
Ames, IA

Last Updated 10/25/2022 01:04 PM
Project Title

Police Department Chiller Unit - 3603022 - City of Cedar Rapids

Physical Address View project details and contacts
City, State (County) Cedar Rapids, IA 52404   (Linn County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $285,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of Police Department Chiller units. The project is included in the city's 2023-2027 capital improvement plan (CIP). As of October 25, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents