Similar Projects
Irvine Turner Boulevard Apartments
New Construction
Conception
Newark, NJ 07103

JFK High-Rise
New Construction
Conception
Bloomfield, NJ 07003

Bloomfield Avenue Apartments
New Construction, Demolition - 25,094 SF
Design
Newark, NJ 07104

Market Street Apartments
New Construction, Renovation, Addition
Design
Newark, NJ 07105

365 Park Avenue
New Construction
Bidding
Newark, NJ 07107

Elevator Modernization Agency-Wide
Renovation
Bidding
Newark, NJ 07114

55 Union
New Construction - 3,078 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
Newark, NJ 07105

Renovation to the Verona Community Pool
Renovation
Post-Bid
Verona, NJ 07044

Student Housing Mixed-Use Development
Results
Newark, NJ

Rehabilitation of Parking Deck #1 at South Mountain Recreation Complex
Results
Newark, NJ

Allure 260
New Construction, Demolition
Construction
$45,000,000 est. value
East Orange, NJ 07108

Allure 260
New Construction, Demolition
Construction
$45,000,000 est. value
East Orange, NJ 07108

Six-Story Mixed-Use Building
New Construction, Demolition
Pending Verification
Belleville, NJ 07109

K&K Project
Renovation - 124,830 SF
Conception
Roseland, NJ 07068

South Orange Avenue Apartments
New Construction
Design
Newark, NJ 07103

Last Updated 11/16/2021 03:25 PM
Project Title

The Halo

Physical Address View project details and contacts
City, State (County) Newark, NJ 07102   (Essex County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Fitness Center, Parking Garage, Swimming Pool(s)
Contracting Method
Project Status Construction Commenced first quarter 2021, Construction Completion Expected first quarter 2023
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Parking includes 12 car charging stations

Details

1,171,142 SF - Fitness Center, 4,488 SF New Construction, Parking Garage, 7 Stories Above Grade, 161,843 SF New Construction, 396 Parking Spaces, Swimming Pool(s), 2 Buildings, Apartments/Condominiums, 58 Stories Above Grade, 583,327 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents