Similar Projects
Old Washington Road Reconstruction - 2186 - County of Charles
Infrastructure
Conception
$6,140,000 CJ est. value
Waldorf, MD 20601

Bryans Road 2MG Water Tower - 6129 - Charles County
New Construction, Infrastructure
Conception
$2,925,000 CJ est. value
Bryans Road, MD 20616

White Plains 2MG Water Tower - Charles County
New Construction, Infrastructure
Design
$7,700,000 CJ est. value
White Plains, MD 20695

Accokeek East Park - Comfort Stations - 4.99.0185 - Prince George's County
New Construction, Infrastructure
Design
$300,000 CJ est. value
Waldorf, MD 20601

Mill, Patch, and Resurface Roadway Pavements at Various Locations in Charles County
Infrastructure
Bidding
$10,000,000 CJ est. value
La Plata, MD 20646

Indian Head Manor Water Main
Infrastructure
Bidding
$500,000 CJ est. value
Bryans Road, MD 20616

T. C. Martin Elementary School - Additions and Renovations
Renovation, Addition
Post-Bid
$28,000,000 to $32,000,000 est. value
Bryantown, MD 20617

L.A. Learning Center / St. Charles
Addition, Renovation, Infrastructure - 13,211 SF
Post-Bid
$1,500,000 CJ est. value
Waldorf, MD 20602

Water Sewer and Reclaimed Waterline Repair Replacement and Construction Services
Infrastructure
Results
La Plata, MD

J.P Ryon Elementary School Classroom Addition
Addition
Results
$3,000,000 to $5,000,000 est. value
Waldorf, MD 20601

Dr. Gustavus Brown Elementary School Limited Renovation
Renovation - 32,833 SF
Construction
Less than $21,600,000 est. value
Waldorf, MD 20602

Pinegrove Mixed-Use
New Construction, Infrastructure - 1,513,730 SF
Pending Verification
$350,000,000 CJ est. value
La Plata, MD 20646

Splash In #1138 - La Plata
Demolition, New Construction, Infrastructure - 3,450 SF
Pending Verification
$2,500,000 CJ est. value
La Plata, MD 20646

Hughesville Water Line - 6114 - Charles County
Infrastructure
Conception
$3,330,000 CJ est. value
Hughesville, MD 20637

RFP D/B - Design and Construct New Gravity Thickener No. 4
Renovation, Infrastructure
Post-Bid
$5,000,000 CJ est. value
La Plata, MD 20646

Last Updated 11/16/2022 09:22 AM
Project Title

Full Day Kindergarten Addition: Walter J. Mitchell Elementary School - 5175 - County of Charles

Physical Address View project details and contacts
City, State (County) La Plata, MD 20646   (Charles County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $6,159,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

There is a need for permanent space to support pre-kindergarten and full-day kindergarten programs at Walter J. Mitchell Elementary School in La Plata, which opened in 1965. Spaces have been appropriated for kindergarten over the years by displacing higher grades to portable classrooms. Mitchell currently houses four kindergarten classes and one pre-k class. An addition containing four kindergarten classrooms and an activity area is proposed. Charles County Public Schools now uses an inclusion model for providing services to pre-kindergarten and kindergarten-aged, special education students. This requires that one classroom at both the kindergarten and pre-kindergarten levels be increased in size to house an additional seven students, a special education teacher and an aide. The existing kindergarten classrooms will be converted to regular classrooms The project is included in the county's 2023-2027 capital improvement plan (CIP). As of November 16, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents