Similar Projects
Airport Site Development
Infrastructure
Conception
Gulfport, MS

RFP - Orphaned Well Site Plugging, Remediation, and Restoration Program (Orphan Well Program) and the State Grant Program
Infrastructure
Conception
$1,380,939 CJ est. value
Jackson, MS 39201

The Spargo at Oxford Commons
New Construction, Infrastructure - 25,000 SF
Design
$6,000,000 CJ est. value
Oxford, MS 38655

RFQ Design - Stennis Hall Cyber AE
Infrastructure
Design
$500,000 CJ est. value
Biloxi, MS 39530

Woodland Clinic Addition
Addition, Demolition, Renovation, Infrastructure
Bidding
$1,052,000 CJ est. value
Woodland, MS 39776

Site Improvements at I-59 South Super Site
Infrastructure
Bidding
$400,000 CJ est. value
Ellisville, MS 39437

Repair and Maintenance Unit Price Project
Infrastructure
Post-Bid
Gulfport, MS

Industrial Site Grading
Infrastructure
Post-Bid
MS

Weymouth Hall EWP Project - City of Natchez
Results
$150,098 est. value
Natchez, MS 39120

Site Improvements Phase II New Capitol Building
Results
Jackson, MS

Velocys Bayou Fuels Project - Belwood Industrial Park
New Construction, Infrastructure
Pending Verification
$1,500,000,000 CJ est. value
Natchez, MS 39120

Pass Christian High School Track Replacement
Infrastructure
Design
$600,000 CJ est. value
Pass Christian, MS 39571

Mill and Overlay of I-20, Installation of a High Friction Surface Treatment on I-55
Infrastructure
Bidding
$21,238,633 CJ est. value
Raymond, MS 39154

Land Clearing Services
Infrastructure
Post-Bid
Lorman, MS

Industrial Park Improvements
Results
Quitman, MS

Last Updated 08/18/2022 01:37 PM
Project Title

Traffic Signal @ East Metro Parkway And Town Center Way

Physical Address View project details and contacts
City, State (County) Flowood, MS 39232   (Rankin County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $410,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope is to construct a new signal at the intersection of E. Metro Parkway and Town Centre Way along with all additional improvements which may include but is not limited to striping, signing and all other work required as shown on the Construction Plans and in the Specifications. The total Contract Time will be 60 consecutive calendar days with liquidated damages at $500.00 per consecutive calendar day thereafter. Bid Security in the amount of 5% of the bid must accompany each bid in accordance with the INSTRUCTIONS TO BIDDERS. No prospective CONTRACTOR may withdraw his proposal within SIXTY (60) DAYS after the actual date of the opening thereof. The CITY OF FLOWOOD reserves the right to waive any information or irregularities or to reject any or all bids. Award will be made to lowest and best bidder as determined by the Owner.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents