Similar Projects
HVAC, Electrical and Roofing On-Call Single Trade Services
Post-Bid
Denver, CO 80202

AFB 2141 CC 2018 Hail Damage Repairs
Post-Bid
$3,800,000 to $4,300,000 est. value
Colorado Springs, CO

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Front Range Village
Renovation
Construction
Fort Collins, CO 80525

Heritage Park Restroom Renovation/Cleo Mudrock Baseball Dugout Roofing Project
Renovation
Construction
Less than $125,000 est. value
Louisville, CO 80027

City of Sterling Reroofing Project
Post-Bid
Sterling, CO 80751

Detention Center Roof G
Results
$100,000 to $150,000 est. value
Broomfield, CO 80021

Replace Roofs Main Building Southwest Campus Phases I and II Pueblo Community College
Construction
Less than $1,223,500 est. value
Mancos, CO 81328

Boulder Water Resource Recovery Facility Roofing Replacement Project
Post-Bid
Boulder, CO 80301

Safeway Roof Project
Results
Broomfield, CO 80020

Kit Carson Sand Shed Roof Repairs
Post-Bid
Kit Carson, CO 80825

Removal and Replacement Roofing
Results
Less than $60,000 est. value
Pueblo, CO 81001

Roof Replacement Johnson Building
Post-Bid
Rangely, CO

Tent Roof Maintenance and Repair
Results
Denver, CO

Last Updated 06/15/2020 12:47 PM
Project Title

SB267 Repair/Replace Roofs Various Buildings CMHIP Phase 1, 2, and 3 (Package 2)

Physical Address View project details and contacts
City, State (County) Pueblo, CO 81003   (Pueblo County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $218,560
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Repair/Replace Various Roofs Buildings CMHIP Ph.1, 2 &3 (Package 2) will be replacing five roofs on the Colorado Mental Health Institute at Pueblo located in Pueblo, Colorado. (1) Building 131 is approximately 9,000 sq. ft. – Utilized by patients from 8 am -5pm, five days a week. (2) Building 132 is approximately 12,900 sq. ft. – Utilized by patients from 8 am -5pm, five days a week. (3) Building 119 is approximately 5,800 sq. ft. – Utilized by patients from 8 am -5pm, seven days a week. (4) Building 116 is approximately 17,100 sq. ft. – Utilized by patients and staff 24/7 (patients residential unit) (Add Alternate #1) (5) Building 115 is approximately 17,100 sq. ft. – Utilized by patients from 8 am -5pm, five days a week. (Add Alternate #2)

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents