Similar Projects
Enhance Pedestrian and Bike Facilities along Main Street - Town of Clifton Park
Infrastructure
Conception
$1,781,000 est. value
Clifton Park, NY

Polyset Expansion
Addition, Infrastructure - 24,500 SF
Conception
$1,250,000 CJ est. value
Mechanicville, NY 12118

Ushers Road Medical Building
New Construction, Infrastructure - 40,000 SF
Design
$5,000,000 CJ est. value
Ballston Lake, NY 12019

Playground Upgrades, Clement Park
Infrastructure
Design
$190,000 CJ est. value
Waterford, NY 12188

Raw Water Source Dam and Transmission Improvements Contract No 1 and Contract No 2
Infrastructure
Bidding
$200,000 CJ est. value
Mechanicville, NY 12118

SAM Sidewalk Project
Infrastructure
Bidding
$80,000 CJ est. value
Schuylerville, NY 12871

Tait Lane Reserve
New Construction, Infrastructure - 212,731 SF
Post-Bid
$80,000,000 CJ est. value
Saratoga Springs, NY 12866

Tait Lane Reserve
New Construction, Infrastructure - 212,731 SF
Post-Bid
$80,000,000 CJ est. value
Saratoga Springs, NY 12866

World-Wide Water Storage Tank Remediation
Term Contract
Results

Lake Water System Improvements Project - Contract No. 3 - Spray Aeration Treatment
Results
Less than $225,000 est. value
Round Lake, NY 12151

One-Four-Six Marketplace
New Construction, Infrastructure - 151,000 SF
Pending Verification
$140,000,000 CJ est. value
Halfmoon, NY 12118

One-Four-Six Marketplace
New Construction, Infrastructure - 151,000 SF
Pending Verification
$140,000,000 CJ est. value
Halfmoon, NY 12118

Malta Intergenerational Community
New Construction, Infrastructure - 17,250 SF
Conception
$5,000,000 CJ est. value
Ballston Spa, NY 12020

Three Silos Residential Subdivision
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Ballston Spa, NY 12020

Shared Services Facility - General Construction
New Construction, Infrastructure - 13,010 SF
Bidding
$4,000,000 CJ est. value
Stillwater, NY 12118

Last Updated 08/23/2022 09:38 AM
Project Title

Button Road Water Storage Tank Project - Contract 1E - Electrical Construction

Physical Address View project details and contacts
City, State (County) Halfmoon, NY 12188   (Saratoga County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $99,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project work sites are located on Button Road and Lower Newtown Road in the Town of Halfmoon, New York. The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including but not necessarily limited to the following: -- Construction of a 1,000,000-gallon elevated water storage tank and associated appurtenances including miscellaneous site work, grading, concrete foundation, foundation piles, tank erection, tank coating and disinfection, piping, altitude valve vault, fencing, paved access road and parking area, and erosion and sediment control measures. -- Open-cut installation of approximately 670 linear feet of 10-inch high density polyethylene water main to connect the proposed water storage tank to the existing water distribution system, including all associated piping, fittings, hydrants, valves, and the hydrostatic testing and disinfection of the water main. Each bid must be accompanied by a bid security in the amount of not less than five percent (5%) of the base bid in the form and subject to the conditions provided in the Information to Bidders. The successful bidder will be required to furnish to the Town of Halfmoon an executed performance and completion bond in a form meeting the Town's approval, in an amount not less than 100% of the accepted bid as security for the faithful performance and completion of this contract, and also a separate bond guaranteeing prompt payment of monies due to all persons supplying the contractors or subcontractors with labor and materials employed and used in carrying out the contract, and having as surety on the bonds such surety companies as are approved or acceptable to the Town of Halfmoon. The Town of Halfmoon reserves the right to reject any or all bids. All work shall be subject to equal opportunity in employment, State wage rates and all other requirements in accordance with applicable law.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents