Similar Projects
Perry Park Road Traffic Safety Improvements
Infrastructure
Bidding
$2,000,000 CJ est. value
Sedalia, CO 80135

Pad B and C Redevelopment
Infrastructure
Bidding
$200,000 CJ est. value
Castle Rock, CO 80108

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

Auburn Hills Infrastructure
Alteration
Post-Bid
Parker, CO 80134

CTF TCF Water Pump Skid Repl. Dq1 GC CMS165046
Results
Less than $60,000 est. value

CTF ECCPC South Pump Station Roof DQ1 GC CMS164761
Renovation
Results
$150,000 est. value
Gunnison, CO 81230

Apex Meridian Phase II
New Construction - 180,000 SF
Construction
$10,000,000 est. value
Lone Tree, CO

Kime Ranch / Parker
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Parker, CO 80138

Lonesome Pine Park Improvements Project
Infrastructure
Bidding
$300,000 CJ est. value
Lone Tree, CO 80124

Auburn Hills Centre
Infrastructure
Post-Bid
Parker, CO 80134

WTP High Service Pump Addition
Addition
Results
$787,000 est. value
Littleton, CO 80125

Plum Creek Widening - Wolfensberger to Phillip South Miller Park (Mac)
Infrastructure
Bidding
$3,000,000 CJ est. value
Castle Rock, CO 80104

Ridgegate Parkway Lyric Street Traffic Signal Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Lone Tree, CO 80124

Well System and Booster Pump Maintenance
Infrastructure
Results
Castle Rock, Franktown, Highlands Ranch, Larkspur, Littleton, Parker, Sedalia, CO 80138

2022 BMR School Bus Road Paving Project
Infrastructure
Post-Bid
$70,000 CJ est. value
Perry Park, CO 80118

Last Updated 08/04/2022 02:04 PM
Project Title

Well L Site Improvements

Physical Address View project details and contacts
City, State (County) Parker, CO 80138   (Douglas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally consists of construction of pipelines, meter vault, and appurtenant, electrical, instrumentation, erosion control, seeding, and restoration work. The site (the "Site") on which all work (the "Work") on the Project shall occur is located near Parker, Colorado, which is within the boundaries of the Owner and located in Douglas County, Colorado. The Work will be performed under a single lump sum contract and shall include furnishing and installation of all materials, labor and equipment as indicated in the Contract Documents and as otherwise required to provide a complete working system for the purpose intended. Bidders may request interpretations or clarifications of the Contract Documents from the Owner by electronic mail. The Owner will not be bound or responsible for any explanations or interpretations other than those given in writing by the Owner. No oral interpretations shall be binding on the Owner. Bidders may request interpretations or clarifications from the Owner through the following contact: Richard Krulish Pinery Water and Wastewater District 5242 Old Schoolhouse Road, Parker, Colorado 80134 Phone: 720-751-2635 email: RKrulish@pinerywater.com. The deadline for requesting interpretations or clarifications from the Owner is 3:00 pm on August 3, 2022. A Pre-Bid meeting is not scheduled. The successful Bidder will be required to furnish the Performance Bond, Payment Bond and Maintenance Bond, as security for the faithful performance and the payment of all of the successful Bidder's obligations under the Contract Documents. The requirement that the successful Bidder furnish a Performance Bond, Payment Bond and Maintenance Bond can be also satisfied by furnishing a combined Performance, Payment and Maintenance Bond. All required bonds shall be in a form satisfactory to the Owner. The successful Bidder will be required to submit a Certificate of Insurance demonstrating that the Bidder carries insurance coverage with limits of not less than those set forth in the Contract Documents, Worker's Compensation Insurance, Employer's Liability Insurance, Commercial General Liability Insurance, Automobile Liability Insurance, Umbrella Liability Insurance, and Builder's Risk Property Insurance No Bids may be withdrawn for a period of fifty (50) days after the Bid Opening. The Notice of Award will be issued on or about August 18, 2022. Substantial and Final Completion dates, as well as liquidated damages provided for failure to meet the Substantial and Final Completion dates, will be included within the Contract Documents available to potential bidders. The Owner reserves the right to reject any or all Bids, may choose to award all, none, or any combination of the project schedules, the right to waive any informality or technicality contained in any Bid and the right to waive any formality or technicality in the bidding procedures.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents