Similar Projects
Replace Building 48 Roof System
Term Contract
Design
$500,000 to $1,000,000 est. value
Hines, IL 60141

Replace/Repair Roofing Systems
Alteration
Design
$219,200 est. value

Replace/Repair Roofing Systems at Multiple Sites
Alteration
Bidding
Less than $250,000 est. value

Replace Roofing System
Alteration
Bidding
Less than $3,000,000 est. value
Chicago, IL

2021 Roof Replacement at Arbor Park MS
Post-Bid
Oak Park, Tinley Park, IL 60477

Roofing Repair and Maintenance
Post-Bid

Modified Bitumen and Shingle Roof Replacement
Results
Chicago Heights, IL 60411

2021 Roof Repairs At Multiple Sites
Results
Hoffman Estates, IL 60169

Heatherfield Roof Replacements
Renovation, Alteration
Design
Glenview, IL 60025

Morton Grove Public Works Roof Improvement
Alteration
Bidding
Morton Grove, IL

2021 Roof Repairs at Heritage Middle School
Post-Bid
Berwyn, IL 60402

Roof Replacement at Chippewa School
Results
Palos Heights, IL 60463

2022 Water Pump House Roof Replacements
Alteration
Bidding
Arlington Heights, IL

2021 South Building Roof Replacement
Post-Bid
Flossmoor, IL 60422

Roof Repairs Sabin ES
Results
Chicago, IL 60622

Last Updated 03/31/2022 11:42 PM
Project Title

Foreman Roof Drain and Repairs

Physical Address View project details and contacts
City, State (County) Chicago, IL 60641   (Cook County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install new 6” roof drain, roof to basement. Open wall on three and two, cut and remove existing pipe, install new pipe. Repair and paint wall. Remove soffit in pool area, remove existing pipe, install and connect new pipe. Build new soffit with Water Resistant Tough X Drywall, paint with water proof paint for high humidity conditions, provide and install lighting system. Repairs to adjacent (to first floor pool) women’s locker room ceiling needs to be removed and replaced. Lights, where needed in women’s locker room, need to be replaced with new. Bathroom on second floor has a wall that needs to be removed (approx.. 12’ x 13’ x 12’) rebuilt and finished. Third floor weight room floor has an oak floor that needs to be have an area 25’ x 25’ removed to concrete base and new oak floor installed. Entire floor sanded, stained, sealed. Patch plaster wall area damaged by water.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents