Similar Projects
West Carroll Avenue Mixed use
New Construction
Conception
Chicago, IL 60607

Bronzeville Lakefront - Phase II
New Construction - 6,700,000 SF
Conception
$3,000,000,000 to $4,000,000,000 est. value
Chicago, IL

Maintenance Offices Construction
Design
$500,000 to $1,000,000 est. value
Rock Island, IL 61299

Compass Global Logistics Hub
New Construction
Design
$1,700,000,000 est. value
Joliet, IL 60436

Pace South Campus Acceptance Facility and Office Building
Renovation
Bidding
Markham, IL 60428

Lyft Support Center
Renovation - 1,500 SF
Bidding by Invitation
Burbank, IL 60459

Addison Office Remodel and Addition
Renovation, Addition - 11,792 SF
Post-Bid
Addison, IL 60101

Kluber Architects Benton Street Office Build Out
Build-Out
Post-Bid
Aurora, IL 60506

183 CES Repair Wing HQ Stage & PA
Results
$25,000 to $100,000 est. value
Springfield, IL 62707

2-Story Office Building With Basement Renovation
Renovation
Results
Chicago Heights, IL 60411

900 West Fulton Mixed Use Development
New Construction, Renovation - 90,000 SF
Construction
Chicago, IL 60607

Metra HQ Tenth Floor Remodeling
Renovation
Construction
$3,361,906 est. value
Chicago, IL 60661

The Point at Six Corners
New Construction - 66,800 SF
Pending Verification
$130,000,000 est. value
Chicago, IL 60611

Mixed-Use Building
New Construction - 47,000 SF
Pending Verification
Chicago, IL 60642

330 North Clark Office Tower
New Construction
Conception
Chicago, IL

Reported 12/11/2020 03:59 PM
Project Title

Clock Tower Centre

Physical Address View project details and contacts
City, State (County) Kankakee, IL 60901   (Kankakee County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method
Project Status Obtained from a News Source
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Office, Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents