Similar Projects
Morris Maintenance Storage Facility
Demolition, New Construction, Infrastructure
Bidding
$13,000,000 CJ est. value
Morris, IL 60450

CTA - Lake Line - Austin Station
Infrastructure, Renovation
Bidding
$900,000 CJ est. value
Chicago, IL 60644

2023 Retaining Wall Maintenance
Term Contract
Sub-Bidding
Palatine, IL 60067

Install Concrete Footings for Tumbler - Village Lab 2
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Batavia, IL 60510

UIC Dumpster Pads
Renovation, Alteration
Post-Bid
Chicago, IL 60607

Weir Concrete Repairs
Alteration
Post-Bid
IL

Pin & Link Assembly Expansion Joint Retrofits 4
Alteration
Results
Chicago, IL

Concrete - Various Sites District Wide Plus Alternative Work
Alteration
Results
Algonquin, Carpentersville, IL 60102

Construction of Arenzville Rural Water Cooperative Phase III
Infrastructure
Construction
$1,519,702 CJ est. value
Arenzville, IL 62611

Construction of Arenzville Rural Water Cooperative Phase III
Infrastructure
Construction
$1,519,702 CJ est. value
Arenzville, IL 62611

Briergate Business District Improvements
Infrastructure
Bidding
$760,000 CJ est. value
Highland Park, IL 60035

Advanced Technology Precast Concrete Hollow Core Planks
Alteration
Post-Bid
Grayslake, IL 60030

Sidewalk/Driveway/Apron and Curb and Gutter Concrete Replacement
Infrastructure, Alteration
Results
Darien, IL

Concrete Work at Various Locations
Term Contract
Post-Bid
Chicago, IL

2022 Concrete Flatwork
Alteration
Results
Lake Zurich, IL

Last Updated 04/30/2023 02:01 AM
Project Title

Replace High Intensity Runway Lights (HIRL) on primary runway and replace Medium Intensity Runway Lights (MIRL) on crosswind runway

Physical Address View project details and contacts
City, State (County) Mount Vernon, IL 62864   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,194,002 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replace High Intensity Runway Lights (HIRL) on primary runway and replace Medium Intensity Runway Lights (MIRL) on crosswind runway Region : 5 District :9 Federal Project #317SBGPTBD County(s) : Jefferson IL Project # MVN 4950 Airport Mt. Vernon Sponsor Mt. Vernon Airport Authority City Mt. Vernon 85 Calendar Days The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting. Questions not accepted as of April 18, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - Call 15A - Replace High Intensity Runway Lights (HIRL) on primary runway and replace Medium Intensity Runway Lights (MIRL) on crosswind runway

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents