Similar Projects
Last Updated | 12/29/2020 09:23 AM |
Project Title | Tabiona Water Improvements Project, 2020 - Tank Phase |
Physical Address | View project details and contacts |
City, State (County) | Tabiona, UT (Duchesne County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project will include construction of a 150,000 gallon reinforced concrete water tank, approximately 3,700 linear feet of 10” PVC drinking water line with 1 associated directional bore under the Duchesne River and the UDOT Highway, gate valves, flow meter installation, water connections etc. For Contractors to be considered, they must be able to bond one million dollars and be able to demonstrate the ability to complete similar sized projects in a timely manner through their provided project experience. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |