Similar Projects
Culinary Water Improvements
Post-Bid
Less than $700,000 est. value
Levan, UT 84639

Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

Z--Dino - Design/Build, Replace Water Line
Results
$500,000 to $1,000,000 est. value
Jensen, UT 84035

Bryner Ploutz Pipeline
Results
$50,000 to $100,000 est. value
Helper, UT 55101

Excavation and Water System Repair Services
Term Contract
Post-Bid
Park City, UT 84060

18K: Printers Row Waterline Replacement
Results
West Valley City, UT

Water Line Pipe and Fittings
Post-Bid
Provo, UT

Decommissioning Water Systems
Results
$50,000 to $100,000 est. value
Price, UT 84501

Clearfield City 10-Inch Waterline Improvement Project on 1000 East Street
Post-Bid
$176,800 est. value
Clearfield, UT 84015

SVW and SID Culinary Water Improvements Project 2019
Results
Less than $2,251,221 est. value
Moab, UT

Conductor Pipe for Stratigraphic Well
Post-Bid
Salt Lake City, UT

Neola Chlorinator Building and Lateral Project 2019
Results
Less than $200,000 est. value
Neola, UT 84053

4100 South Secondary Waterline Project
Post-Bid
Magna, UT 84044

500 South Surplus Siphon Vault Replacement
Results
Less than $244,438 est. value
Salt Lake City, UT 84104

River Bottom Improvement Project Prequalification
Post-Bid

Last Updated 12/29/2020 09:23 AM
Project Title

Tabiona Water Improvements Project, 2020 - Tank Phase

Physical Address View project details and contacts
City, State (County) Tabiona, UT   (Duchesne County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will include construction of a 150,000 gallon reinforced concrete water tank, approximately 3,700 linear feet of 10” PVC drinking water line with 1 associated directional bore under the Duchesne River and the UDOT Highway, gate valves, flow meter installation, water connections etc. For Contractors to be considered, they must be able to bond one million dollars and be able to demonstrate the ability to complete similar sized projects in a timely manner through their provided project experience.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents