Similar Projects
Alyssum and Twinflower Storm Line Replacement - City of Forest Grove
Infrastructure
Conception
$300,000 est. value
Forest Grove, OR 97116

Park Place Bridgeport Mixed Use / Tualatin
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
King City, OR 97224

Fanno Creek Trail: Woodard Park-Bonita Road/85th Avenue-Tualatin Bridge
Infrastructure
Design
$5,980,000 CJ est. value
Tigard, OR 97223

OR8: SW Hocken Avenue - SW Short Street
Infrastructure
Design
$7,901,395 CJ est. value
Beaverton, OR 97005

HiLight FTTP Construction Shute Park Phase 3 - Public Improvement ITB
Infrastructure
Bidding
$308,000 CJ est. value
Hillsboro, OR 97123

Rock Creek Recycled Water Pipeline Project
Infrastructure
Bidding
$3,200,000 CJ est. value
Hillsboro, OR 97123

South West 209th Avenue Kinnaman Road to Alexander Street 36-Inch PVC Pipe
Infrastructure
Post-Bid
$150,000 to $200,000 est. value
Aloha, OR 97007

Water Transmission Pipeline
Infrastructure
Post-Bid
$15,000,000 to $20,000,000 est. value
Sherwood, OR 97140

North Pipeline Lateral N1 Relocation at NorthWest Martin Road and Highway 47 for Tualatin Valley Irrigation District
Infrastructure
Results
$25,000 to $100,000 est. value
Forest Grove, OR 97116

Aloha INN PSH Civil Work
Infrastructure
Results
$65,000 est. value
Hillsboro, OR

Scholls Heights Apartments
New Construction, Infrastructure
Pending Verification
$81,500,000 CJ est. value
Beaverton, OR 97007

Cedarbrook of Tigard Senior Living
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Portland, OR 97223

Bagan Park - 92067 - City Of Tigard
Infrastructure
Conception
$935,000 CJ est. value
Tigard, OR 97223

North Dakota Street: Fanno Creek Bridge
New Construction, Infrastructure
Design
$3,326,890 CJ est. value
Tigard, OR 97223

Kruger Road and Parrett Mountain Road Broadband Extensions
Infrastructure
Bidding
$800,000 CJ est. value
Sherwood, OR 97140

Last Updated 10/27/2022 02:36 PM
Project Title

Cornelius Pass Road Pipeline Project - Willamette Water Supply

Physical Address View project details and contacts
City, State (County) Hillsboro, OR 97123   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected January 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $4,507,318 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Hillsboro is partnering with the Tualatin Valley Water District (TVWD) and the City of Beaverton to develop the mid-Willamette River at Wilsonville as an additional water supply source to meet our community’s needs today, in the future, and during emergencies. A 3.3-mile section of transmission pipeline to supply Hillsboro and TVWD water will be constructed between Frances Street and just south of Highway 26. The project also includes a separate section of local service pipeline for the City of Hillsboro. The pipeline will be constructed in Cornelius Pass Road, with small sections built outside of the roadway where necessary. As of October 27, 2022, a contractor has been selected. Water pipeline construction is anticipated to begin in early 2023. *For more information, please refer to http://www.ourreliablewater.org/cornelius-pass-road-pipeline-project/

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents