Similar Projects
HVAC Preventative Maintenance Services
Term Contract
Post-Bid
Newmarket, NH

Weatherization and Home Energy Assistance Services
Post-Bid
Merrimack, NH

Lebanon Airport Terminal HVAC Improvements
Results
$230,000 to $250,000 est. value
Lebanon, NH 03784

HVAC Drives
Results
Newington, NH 03308

Replacement of Air Handlers and Computer Units
Post-Bid
Nashua, NH 03060

Repair HVAC Unit, Londonderry, New Hampshire
Results
Londonderry, NH

Unit Heater Replacement - 2021
Term Contract
Post-Bid
Seabrook, NH 03874

HVAC Repairs and Boiler Preventative Maintenance
Results
Concord, NH 03301

Thermal Remediation of Volatile Organic Compounds Project
Post-Bid
Salem, NH 03079

HVAC Controls Replacement
Results
New Boston, NH 03070

HVAC Maintenance and Repair Services
Term Contract
Post-Bid
Concord, NH

Nursing Home Chiller Replacement
Results
Laconia, NH 03246

2021 Heating and Plumbing System Contract
Post-Bid
Lebanon, NH

New Boilers
Results
Hanover, NH 03755

LPD Mini-Split Air Conditioning Project
Post-Bid
Laconia, NH 03246

Last Updated 01/02/2020 03:59 PM
Project Title

Refrigeration System

Physical Address View project details and contacts
City, State (County) Hanover, NH 03755   (Grafton County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The U.S. Army Engineer Research and Development Center (ERDC), Cold Regions Research and Engineering Laboratory (CRREL) has a requirement delivery and installation of 20 refrigeration tons or greater of refrigeration capacity in two chiller-compressor units mounted on a single wheeled carriage for interface with a 24-foot gauge rail system at the Geophysical Research Facility (GRF). This system shall comprise two compressors for redundancy, powering three low-profile Air Handler Units each which shall be installed within the GRF roof with piping connecting them to the wheeled carriage. This system shall be provided with all pumps, valves and piping required to operate with all equipment delivered to CRREL for installation at the GRF.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents