Similar Projects
HMA Overlay Minor Structural
Infrastructure
Design
$8,723,922 est. value
Rensselaer, IN 47978

Courthouse Drainage Improvement Project
Infrastructure
Bidding
$300,000 CJ est. value
Rensselaer, IN 47978

Courthouse Drainage Improvement Project
Infrastructure
Bidding
$300,000 CJ est. value
Rensselaer, IN 47978

2021 Asphalt Paving
Infrastructure
Post-Bid
$1,091,003 est. value
Rensselaer, IN

Mill, Patch, and Resurface Roadway Maintenance
Results
Rensselaer, IN

Abandoned Coal Mine Restoration
Results
$150,000 est. value

2021 Road Improvements
Results
DeMotte, IN

Replace Superstructure, Bridge Deck Overlay
New Construction
Results
IN

2021 Road Resurfacing
Infrastructure
Results
$1,091,003 est. value
Rensselaer, IN

Tri-County Primary School Site Improvements
New Construction, Infrastructure
Results
$200,000 est. value
Remington, IN 47977

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Results

Idiq, District Wide Bridge Maintenance
New Construction
Results

Bridge Project Development Services - One twin-bridge thin deck overlay and one superstructure replacement
Infrastructure
Results

Bridge Thin Deck Overlay and Small Structure Pipe Lining
New Construction
Results

Bridge and Small Structure Replacement and Pipe Lining
New Construction, Infrastructure
Results

Last Updated 08/29/2022 08:36 PM
Project Title

Jasper County Bridges No. 191 and No. 195

Physical Address View project details and contacts
City, State (County) Rensselaer, IN 47978   (Jasper County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work for which proposals are to be received is for the replacement of Bridge No. 191 carrying County Road 900 North over Wheatfield Ditch as well as the bridge rehabilitation on Bridge No. 195 carrying County Road 100 West over Davisson Ditch. For Bridge No. 191, the work will consist of replacing the existing structure with a single span prestressed composite concrete box beam structure. Along with the bridge work, approximately 250 feet of approach construction is included in the immediate vicinity of the bridge. For Bridge No. 195, the work will consist of removing and replacing the superstructure with prestressed composite concrete box beams and a variable depth concrete bridge deck. Along with the bridge work, approximately 100 feet of approach construction is included in the immediate vicinity of the bridge. Bids shall be properly and completely executed on Bid Forms and in the order as identified and contained in the Contract Documents obtainable from the offices as stated above. Each bid shall be accompanied by a completely filled out Form No. 96 (latest revision) and acceptable Bid Security. Any bid not accompanied by the above-required items shall be deemed to be a non-responsive bid. No Bidder may withdraw his proposal within a period of 60 days following the date set for the receiving of bids. The Owner reserves the right to retain any and all bids for a period of not more than 60 days and said bid shall remain in full force and effect during said time. The Owner further reserves the right to waive informalities and to award the Contract to any Bidder all to the advantage of Jasper County or to reject all bids. BID SECURITY: Each bid shall be accompanied by an acceptable certified check made payable to the Jasper County Board of Commissioners or an acceptable bid bond in the amount equal to 10% of the total bid price executed by an incorporated surety company in good standing and qualified to do business in the State of Indiana and whose name appears on the current Treasury Department Circular 570. BONDS: A Performance Bond and Payment Bond each in the amount of 100% of the Contract price will be required from the Contractor to whom the work is awarded. INDIANA REQUIREMENTS: Standard Questionnaire Form 96 (latest revision), completely filled out and signed, including attachment of Contractor's Financial Statement as stipulated in Section III. COUNTY REQUIREMENTS: A prevailing wage scale will not be required for this project. PRE-BID CONFERENCE: No pre-bid conference is scheduled for the project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents