Last Updated 01/19/2021 06:25 AM
Project Title

Ozone System Upgrades - Water Treatment Facilities - Electrical Construction

Physical Address View project details and contacts
City, State (County) Altoona, PA   (Blair County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work will be performed in multiple phases for the replacement of ozone generation and feed systems at the Tipton, Plane Nine and Mill Run water treatment facilities. The project includes demolition of ozone-related equipment and installation of new liquid oxygen (LOX) storage and feed gas preparation and piping systems, new ozone generators, closed-loop cooling water system, side-stream injection and mixing systems, nitrogen-boost system, ozone gas destructors, mechanical piping, electrical work, instrumentation and control systems and all required appurtenances. The ozone generating equipment system and liquid oxygen equipment systems will be furnished by the Altoona Water Authority for installation and/or interconnection by the Contractor under separate manufacturer procurement contracts.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents