Similar Projects
Furniture and Related Services for the University of Colorado
Post-Bid
Aurora, Boulder, Colorado Springs, Denver, CO 80045

Peterson AFB Building 1280 USAFA Band Furniture
Post-Bid
Colorado Springs, CO 80914

Building 2027 Basement Furniture and Electrical
Post-Bid
Colorado Springs, CO 80914

B1876 Furniture Buy for Rm 104, Peterson AFB, Co
Results
Colorado Springs, CO

CSPD Evidence Shelving System
Post-Bid
Colorado Springs, CO

Furniture Moving
Post-Bid
Colorado Springs, CO

Console Furniture for the National Space Defense Center (47 Stations)
Post-Bid
Colorado Springs, CO 80916

BLDG 1470 AFAA Furniture, Peterson AFB
Post-Bid
Colorado Springs, CO

FN1505-20 Furniture Components Installation Services
Post-Bid
Washington, DC

Integrated Modular Medical Support Systems (IMMSS) Systems Furniture
Post-Bid

Bldg 1324 Furniture
Post-Bid
Colorado Springs, CO 80916

DoDEA Life Cycle Replacement for School and Office Furniture
Post-Bid
$250,000 to $15,000,000 est. value

Building 101 Room 205 Cheyenne Mountain AFS Furniture
Post-Bid
Colorado Springs, CO 80914

Furniture FMSD
Post-Bid
$10,000 to $10,000,000 est. value

Systems Furniture & Installation
Bidding
Washington, DC

Reported 09/11/2020 12:00 AM
Project Title

832016624 DISA North Field Office Cubicle Furniture

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80914   (El Paso County)
Category(s) Single Trades
Sub-Category(s) Furnishings
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall provide all parts and labor necessary to meet the approved design. All parts will be delivered and installed in Bldg. 1470, Room 216. Cubicles will be assembled in accordance to the design and electrical wired with at least two circuits to outlets and lighting built into the cubicle panels. Acceptance will compare installation to design and test all cabinet functions, cabinet key locks, overhead lighting, electrical outlets, and overall stability of the cubicle structures. Acceptance will also include inspecting for any damage incurred during transport and/or installation.

Details

Division 12 - Furnishings, Office Furniture.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents