Similar Projects
On Call Drilling and Well Installation Services for City Landfills
Term Contract
Bidding
Sacramento, CA 95811

On-Call Drilling and Well Installation Services for City Landfills
Term Contract, Alteration
Bidding
Sacramento, CA

Southern Pump Station Project
Infrastructure
Post-Bid
$6,200,000 est. value
El Centro, CA 92244

Drilling and Construction of Well 32 and 33 Project
Infrastructure
Post-Bid
Colton, San Bernardino, CA 92324

Grayson Well 69 (Replacing Well 274)
Infrastructure
Results
$2,449,000 est. value
Grayson, Modesto, CA 95363

Treated Water Booster Pumps
Alteration
Results
CA

Hatchery Pump Maintenance and Repair
Term Contract
Bidding
$40,000 est. value
CA

Well Pumping Plant 31, Fogg Street
Infrastructure
Post-Bid
$1,600,000 to $1,800,000 est. value
Colton, CA 92324

Groundwater Flush to Waste Project
Infrastructure
Results
Sacramento, CA 95838

SLAC 1801 Pumps Installation
Term Contract
Bidding
West Menlo Park, CA 94025

Well and Pump Maintenance and Repair
Infrastructure
Post-Bid
$114,000 est. value
Napa, Suisun City, CA 94585

Chilled Water Pump Project
Infrastructure
Results
Marysville, CA 95901

Construction Management and Inspection Services for Olcese 3 Well Building Construction
Term Contract, Alteration
Bidding
Bakersfield, CA

Martin Slough Flow Enhancement Project
Alteration
Post-Bid
Eureka, CA 95503

Groundwater Treatment Plant Design-Build (Phase B)
New Construction, Infrastructure
Results
Anaheim, CA

Reported 02/02/2022 12:00 AM
Project Title

Well Site Feasibility

Physical Address View project details and contacts
City, State (County) Sacramento, CA   (Sacramento County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Task 1 – Groundwater Well Siting - Firm shall provide well siting services to evaluate the potential for groundwater production at sites identified within the City’s Groundwater Master Plan. Drill exploratory borings at well locations. Test well installation and preliminary yield and water quality evaluations. Firm shall assume an initial 10 sites will be tested for exploratory borings, and of the 10 sites, 5 of the sites will be installed with test wells for further evaluation. Task 2 – Siting and CEQA for Replacement Well - Firm shall provide well siting and CEQA services for the replacement well for the City’s existing Well 159.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents